Top-rated paving pros.

Best paving pros near Haiku, HI

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Haiku, HI?

Select your specific project to find the pro for you.

Top-Rated Paving pros in Haiku - Updated Nov 2026

Avatar for Po Brothers LLC
Po Brothers LLC
5.0(
14
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Haiku, HI and surrounding areas

Approved

In business since 2015

Free estimates

Credit card accepted

Aloha, here at Po Brothers LLC, we take pride in our quality work at a fair price. We specialize in land clearing, building site prep, landscape retaining walls, trenching, swimming pool and septic digs, driveways, concrete prep and forming work, area/gutter drains and we service the entire island of Maui. \n \nGive us a call now at 808-281-5102 or 401-742-0573. \n \nhttps://pobroexcavation.com/ \n \n \nMahalo, \nAkua and Rusty

Septic system
Utility trench
Utility trench
Gravel driveway and pad
Gravel driveway and pad

+41

Recommended by50%of homeowners
Avatar for Po Brothers LLC
Po Brothers LLC
5.0(
14
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Haiku, HI and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"Akua and Rusty are professional, capable, trustworthy and excellent at what they do. We needed a large backyard area cleared of old chicken coops, construction debris and old machinery, sheds and plant material. They arrived promptly and immediately came up with a plan to maximize their time and resources. They are smart problem solvers working with patient and positive attitudes and were able to remove 22,000 lbs of waste/trash from the property in 3 days. The invoicing was clear and the price was fair. I highly recommend Po Brothers! They exceeded all expectations. I will absolutely call them again."
Pool layout
7’ deep pool hole ready for construction
Pipe installation
Pipe backfill
Jungle

+29

Response time8 hrs
Response rate91%
5 neighbors recently requested a quote
All Phase Masonry
New to Angi
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Haiku, HI and surrounding areas

In business since 2010

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Response time1 hour
Response rate100%
Showing 1-10 of 15
Paving Services FAQs, answered by experts

If you wish to break up a cracked or broken paver for removal, you can use a hammer or mallet and a chisel to fragment the paver. As you’re working, be careful not to disturb surrounding pavers; the key is to work slowly and steadily and remove the broken pieces gently. You should also wear a mask and goggles to ensure that no dust gets into your eyes, nose, or mouth as you work.

A driveway's lifespan varies by material. Asphalt driveways typically last 15 to 30 years, while concrete driveways last longer, between 20 and 50 years. The longevity of any driveway is affected by factors like extreme temperatures, heavy traffic, and the quality of maintenance. Regular upkeep, such as filling cracks, resealing the surface, and ensuring proper drainage, can help extend its life. For gravel driveways, regrading to fill in uneven areas every year or two is recommended.

The recommended minimum amount for a paver base is 4 inches. From there, it depends on the kind of traffic the pavers will see and the current soil conditions. Two inches of paver base won’t create the amount of stability and support that pavers need to remain securely in place over time.

Compared to options like concrete, asphalt, and pavers, resin driveways are far more flexible. As a result, they are more durable against chipping and cracking. Their bonded surface allows them to withstand extreme cold and heat without succumbing to the warping or cracking caused by freeze-thaw cycles. In addition, resin driveways are easy to clean and maintain.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Haiku, HI homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.