Top-rated basement remodelers.

Get matched with top basement remodelers in Aragon, GA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Aragon, GA?

Select your specific project to find the pro for you.

Find Basement remodelers in Aragon

Avatar for AAA Basement Waterproofing
AAA Basement Waterproofing
4.8(
83
)
Basement - Remodel

Serving Aragon, GA and surrounding areas

In business since 1995

Free estimates

Emergency services offered

"My experience started out great, from the first call to the evaluation. I was able to get an appointment within the same week. Even called back to let me know an opening had become available. During the evaluation I felt AAA Basement was being honest with me about what was needed. No Services were needed, but I was a list of things to work on to prevent mold from developing. The list was explained thoroughly and discussed the need for a Dehumidifier. We have since put in the dehumidifier and things are going great.
"
Full Interior Encap Sys
Full Interior Crawl Drainage Sys
Before Crawl Drainage System
Before Sub-Floor System
After Sub-Floor System

+5

Recommended by100%of homeowners
Avatar for Lanning Construction LLC
Lanning Construction LLC
5.0(
4
)
Basement - Remodel

Serving Aragon, GA and surrounding areas

In business since 2024

Free estimates

Warranties offered

"He is a skilled contractor and a hard worker. He gave me a very competitive price and did excellent work remodeling my kitchen for me. He shows up on time and does what he says he is going to do. I will definitely hire him again."
Recommended by100%of homeowners
Paris Mountain Contracting, LLC
5.0(
6
)
Basement - Remodel

Serving Aragon, GA and surrounding areas

In business since 2006

Free estimates

Warranties offered

"Mark is very easy to work with. He was a help in giving us ideas that we hadn't considered that proved very useful. Mark was also very flexible about changing things that I wanted done differently. His work looks excellent. He pointed out problems with the house structure, fixing them as he put in a new basement bathroom and repaired and put in a new deck floor."
12x50 Deck
Ask the Expert 1
12x50 Deck
Ask the Expert 1
12x50 Deck

+3

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Aragon, GA and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
...
Showing 1-10 of 52
Basement Remodel questions, answered by experts

Unless you have extensive experience in construction work, remodeling a basement is best left to a professional. There are several tasks associated with this project that require exact precision, including:

  • Replacing insulation 

  • Replacing carpet or other flooring 

  • Adding heating and cooling

  • Adjusting or adding walls and doors

  • Altering or adding plumbing elements

If any of these elements is done incorrectly, it could severely impact the quality of your basement remodel and be dangerous. Changing a basement often comes with code safety requirements, like egress windows and proper ventilation. Therefore, leaving it up to a professional is often the best decision.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

If you don’t have a crawl space but have a partial basement you want to make deeper, you can expect to spend a little less—between $40,000 and $90,000 on average. However, if you’re not adding new finished square footage, you won’t see much in the way of ROI.

Envision the type of bar experience you'd like to create for your guests. For example:

  • Does your basement have enough finished space for bar stools or seating?

  • What type of additional lighting would set the tone for the room?

  • Are there basement windows or an HVAC system?

  • Do you need new plumbing in your basement for a proper wet bar?

  • Could you be happy with a built-in wall cabinet bar rather than a full-scale wet bar?

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

The Aragon, GA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.