Top-rated basement remodelers.

Get matched with top basement remodelers in Dunedin, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Dunedin, FL?

Select your specific project to find the pro for you.

Find Basement remodelers in Dunedin

Avatar for Martin Day Construction LLC
Martin Day Construction LLC
5.0(
2
)
Basement - Remodel

Serving Dunedin, FL and surrounding areas

Approved

In business since 2018

Free estimates

Credit card accepted

We have a single mission: Complete Customer Satisfaction! We have consistently focused on the needs of our customers, providing personalized attention and a stress-free experience.\nYou will find us to be competitively priced with close attention to the details.\nOur reputation is based on service, safety, and quality, regardless of how large or small the job.\nWe look forward to building a lasting relationship and guarantee your satisfaction!\n

Bathroom Remodel
Response time1 day
Response rate100%
Avatar for CER Design Build
CER Design Build
4.8(
21
)
Basement - Remodel

Serving Dunedin, FL and surrounding areas

In business since 2000

Free estimates

Emergency services offered

""I am very pleased with the work of Cer Custom Renovations. The guys did a quality job on Remodeling for my project. All work was completed on time without delays or shortcomings. I will recommend the company to my friends and business colleagues. Thank you for the good work!""
Custom cabinets
Chefs kitchen
Master bath
Theater
Additional Photos

+22

Recommended by95%of homeowners
Avatar for Tampa Bay Marble and Design
Tampa Bay Marble and Design
4.7(
174
)
Basement - Remodel

Serving Dunedin, FL and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Remodeling our kitchen was an interesting experience and we were very happy with the result. Since first day Jess was very helpful and transparent with the information we needed and was always available for any question we might had. He and his team did everything to make the experience as smooth and efficient as possible. It only took 2 weeks to complete the remodeling and they were very professional and always on time with the schedule."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+28

Recommended by94%of homeowners
Avatar for Southwest Florida Builders Group
Southwest Florida Builders Group
5.0(
5
)
Basement - Remodel

Serving Dunedin, FL and surrounding areas

In business since 2017

Free estimates

Emergency services offered

"The project went smooth and fast. They met all timeline markers and was amazing. The project came out beautiful. Their quality exceeded my expectations. I am really happy and will definitely be calling them back for the future."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+10

Recommended by100%of homeowners
Avatar for World Class Maintenance, Inc.
World Class Maintenance, Inc.
4.2(
40
)
Basement - Remodel

Serving Dunedin, FL and surrounding areas

In business since 1993

Free estimates

Warranties offered

"In the past it has been extremely hard to find a qualified contractor that understands your future state vision, budget and timeline. World Class Maintenance exceeded all of my expectations! From the time they quoted the project they offered suggestions on how to make the vision come alive while being conscious of our budget. I am absolutely in love with all of the work completed... the new tile, baseboards, shiplap wall and crown molding work completed. Each tile was cut and put in place perfectly, the attention to detail was phenomenal. They are trustworthy professionals that have already been recommended to several friends. World Class Maintenance will treat your home as if your place is like their own property or home. Save your energy, look no further you will not be disappointed with World Class Maintenance."
Before
Concrete/Brickface Design
Hookah Lounge
After
Concrete/Brickface Design

+26

Recommended by89%of homeowners
...
Showing 1-10 of 70
Basement Remodel questions, answered by experts

Efficient appliance positioning, optimizing existing plumbing, and sourcing energy-efficient materials reduce financial impact and increase sustainability.

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

Although homeowners often use the terms basement remodeling and basement finishing interchangeably, they are quite different terms. 

Finishing a basement is the process of taking a basement space that is not habitable and adding elements to make it usable. This includes adding plumbing, flooring, and insulation.

Remodeling a basement means taking an already existing finished basement and changing it, often by adding or removing walls, adding plumbing, or changing the existing flooring.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

You technically can paint wires in a basement ceiling, but there are several important safety and code considerations. It's safe to paint non-metallic sheathed cable as long as the labeling remains visible. You can also paint low-voltage wires and conduit and junction boxes to help them blend into your basement. 

However, you should not paint damaged or deteriorated wiring is a fire hazard because it poses a fire hazard. The same goes for painting over high-heat wires that connect to heat-generating appliances or systems. Be sure to avoid painting multiple coats onto any wires, as that traps heat and poses fire risks.

The Dunedin, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.