Top-rated basement remodelers.

Get matched with top basement remodelers in Dunedin, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Dunedin, FL?

Select your specific project to find the pro for you.

Find Basement remodelers in Dunedin

Avatar for Martin Day Construction LLC
Martin Day Construction LLC
5.0(
2
)
Basement - Remodel

Serving Dunedin, FL and surrounding areas

Approved

In business since 2018

Free estimates

Credit card accepted

We have a single mission: Complete Customer Satisfaction! We have consistently focused on the needs of our customers, providing personalized attention and a stress-free experience.\nYou will find us to be competitively priced with close attention to the details.\nOur reputation is based on service, safety, and quality, regardless of how large or small the job.\nWe look forward to building a lasting relationship and guarantee your satisfaction!\n

Bathroom Remodel
Response time1 day
Response rate100%
Avatar for CER Design Build
CER Design Build
4.8(
21
)
Basement - Remodel

Serving Dunedin, FL and surrounding areas

In business since 2000

Free estimates

Emergency services offered

""I am very pleased with the work of Cer Custom Renovations. The guys did a quality job on Remodeling for my project. All work was completed on time without delays or shortcomings. I will recommend the company to my friends and business colleagues. Thank you for the good work!""
Custom cabinets
Chefs kitchen
Master bath
Theater
Additional Photos

+22

Recommended by95%of homeowners
Avatar for Tampa Bay Marble and Design
Tampa Bay Marble and Design
4.7(
174
)
Basement - Remodel

Serving Dunedin, FL and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Remodeling our kitchen was an interesting experience and we were very happy with the result. Since first day Jess was very helpful and transparent with the information we needed and was always available for any question we might had. He and his team did everything to make the experience as smooth and efficient as possible. It only took 2 weeks to complete the remodeling and they were very professional and always on time with the schedule."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+28

Recommended by94%of homeowners
Avatar for Southwest Florida Builders Group
Southwest Florida Builders Group
5.0(
5
)
Basement - Remodel

Serving Dunedin, FL and surrounding areas

In business since 2017

Free estimates

Emergency services offered

"The project went smooth and fast. They met all timeline markers and was amazing. The project came out beautiful. Their quality exceeded my expectations. I am really happy and will definitely be calling them back for the future."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+10

Recommended by100%of homeowners
Avatar for World Class Maintenance, Inc.
World Class Maintenance, Inc.
4.2(
40
)
Basement - Remodel

Serving Dunedin, FL and surrounding areas

In business since 1993

Free estimates

Warranties offered

"We interviewed several companies. World Class Maintenance was the cheapest and shortest completion time. We had a major remodel and were actually told by a company it was too big for them. World class maintenance finished before the quoted time and came in on budget. We added quite a few things to the list as we went and the prices were fair and did not add on to the completion time. Extremely satisfied with their work. We had multiple crews come thru our house and each was professional and respectful. They cleaned up after themselves and made sure we were completely satisfied. Highly recommend them for large jobs."
Before
Concrete/Brickface Design
Hookah Lounge
After
Concrete/Brickface Design

+26

Recommended by89%of homeowners
...
Showing 1-10 of 70
Basement Remodel questions, answered by experts

Renovations that add functionality or more comfortable floor space generally add the most value when remodeling your home. Attic or basement finishing can add floor space without altering the home's structure, saving you renovation money while adding valuable space. Smaller improvements, such as installing smart-home components or replacing entry doors and windows, also experience high ROIs. 

Yes, you can add a door to your basement—it might even be required, depending on building codes in your area and whether or not you’re using the basement as a bedroom. A basement contractor can give you some advice on installation and help you add a door to your basement.

Common mistakes when finishing basement walls include neglecting proper insulation, insufficient moisture management, and poor ventilation. Not addressing these issues can lead to mold growth, water damage, and discomfort. Additionally, inadequate planning, improper framing, and rushing the project can result in subpar outcomes. 

It's essential to follow best practices, seek professional guidance if needed, and prioritize thoroughness and attention to detail.

The best type of basement ventilation system depends on your budget, the moisture in your basement’s air, and the types of windows you have down there. You should consider all of these factors when choosing a ventilation system. However, the most effective method for basement ventilation is an energy recovery ventilator (ERV) or a whole-house ventilation system, which preheats or precools incoming air from the outside while also managing water vapor.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Dunedin, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.