Top-rated basement remodelers.

Best basement remodelers near Cutler Ridge, FL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Cutler Ridge, FL?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Cutler Ridge - Updated Nov 2026

Sosso Remodeling
5.0(
18
)
Basement - Remodel

Serving Cutler Ridge, FL and surrounding areas

"Sosso Remodeling is a must-have if you're looking for remodeling your property. He does a really excellent job and is skilled in everything he does with very high quality. I hired Sosso remodeling to do several things that were needed to be done like bathroom remodeling, electrical work, and more. The results were very impressing. His attention to detail is unbelievable! No regret hiring him and is definitely worth the value."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+47

Recommended by100%of homeowners
A-1 Interior Works Inc
4.7(
148
)
Basement - Remodel

Serving Cutler Ridge, FL and surrounding areas

In business since 2005

"Overall Dan was very professional, responsive and punctual. It is amazing when you have a vendor show up at the time promised! He was always at least 10 minutes before the promised time. Dan and Tony were able to complete the long lists of items within a few days. I appreciate all of your hard work and dedication. The guys even came to my place on a Sunday to put in a half day to meet my deadlines. Be sure to be clear when giving direction - we had a couple mistakes that had to be fixed along the way due to paint selection in the wrong areas within the property. Dan and Tony fixed the issues once addressed with no complaints. Dan went above and beyond to help me with issues that arose during the project (i.e. exchanging a damaged bathroom vanity and minor retro fitting to old plumbing). Thank you again Dan for everything! I will definitely recommend you to my friends and family in the South Florida area.
"
Recommended by95%of homeowners
...
Showing 1-10 of 91
Basement Remodel FAQs, answered by experts

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

Yes. Renovating your basement has a return on investment (ROI) of 75%, meaning your remodel investment will significantly increase the value of your home. Besides the ROI, your family can enjoy a larger, more usable space while you live there. 

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Cutler Ridge, FL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.