Top-rated basement remodelers.

Get matched with top basement remodelers in Parker, CO

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Parker, CO?

Select your specific project to find the pro for you.

TRUSTED BY PARKER, CO HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon484
    Verified basement remodels reviews

Find Basement remodelers in Parker

Avatar for Wright Brother's Construction & Design Services
Wright Brother's Construction & Design Services
4.8(
64
)
Basement - Remodel

Serving Parker, CO and surrounding areas

Approved

In business since 2007

Free estimates

Warranties offered

"We were so please with the work finishing our basement from the start to the finish. Jordan spent the time with us in the initial layout and planning and worked openly with our ideas. During the construction they were super neat and cleaned up daily. They kept to the schedule and the budget. Best of all is that our basement looks awesome!! Would highly recommend these brothers for your construction work!"
1 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Master MCG Remodeling
Master MCG Remodeling
4.9(
62
)
Basement - Remodel

Serving Parker, CO and surrounding areas

Approved

Super Service Award Winner

In business since 2012

Free estimates

Emergency services offered

"Dylan did an amazing job on my living room remodel project. I needed to replace an '80s wood banister with a floor to ceiling wall, along with adding wood planks to the ceiling. He exceeded my expectations and I am so happy with the look of my new living room!"
Remodeling - General Project
Ceiling wood cover
Remodeling - General Project
Remodeling - General Project
Ceiling wood cover

+37

Response time3 days
Response rate100%
1 neighbors recently requested a quote
Avatar for D&D Remodeling
D&D Remodeling
5.0(
79
)
Basement - Remodel

Serving Parker, CO and surrounding areas

Approved

In business since 1999

Customers say: Quick response

"We could not be more pleased with our basement remodel from D&D. The basement is now my favorite part of the home. Dylan listened to all our wild ideas from a murphy bookshelf, rock wall, inlaid shelving, dry bar and french doors and provided the expertise to make them all come to life. The project was on time and every step of the process was clearly communicated with us beforehand. They took extra care in all the finishing touches from molding to the specific hue of lighting. Their team was extremely conscientious, friendly, and cleaned up at the end of each day. Dylan and a team member stayed well into the evening one night to help resolve a plumbing issue that came up that was no fault of his team. We definitely feel like the D&D team went above and beyond for us and can't wait to use them for another project."
ORCHARD GATE BATHROOM
HERITAGE ESTATES BASEMENT
COLUMBINE ST BATH
HERITAGE ESTATES BASEMENT
STRATTON RIDGE BATHROOM

+57

Response time1 day
Response rate90%
Recommended by75%of homeowners
Avatar for Sage Homes Design and Build, Corp.
Sage Homes Design and Build, Corp.
5.0(
8
)
Basement - Remodel

Serving Parker, CO and surrounding areas

Approved

In business since 2024

Free estimates

Warranties offered

"I hired Sage Homes to transform my basement into a gaming area, wet bar, guest room, and bathroom. The project was completed on time and within budget, which was a huge relief. Christi was excellent at communicating throughout the entire process. The crew was professional and cleaned up after themselves. I'm very happy with the quality of the work and the finished basement is a cozy addition to our home. I would highly recommend Sage Homes to anyone looking for a basement remodel!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+18

Recommended by87%of homeowners
Avatar for Superior Remodeling
Superior Remodeling
5.0(
15
)
Basement - Remodel

Serving Parker, CO and surrounding areas

Approved

Free estimates

Credit card accepted

Customers say: True professional

"Superior Remodeling was easy to communicate with and worked with us to stay in budget since we were working on insurance money. The work was done quickly and quality work. The walls that needed repairs look fantastic, can't even tell where the texturing is and the carpet was installed so nicely I feel like my basement never flooded and I can go back to normal. Highly recommend their services!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+29

8 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Richlynn Construction and Remodeling
Richlynn Construction and Remodeling
4.5(
85
)
Basement - Remodel

Serving Parker, CO and surrounding areas

Approved

In business since 1998

Free estimates

Warranties offered

"Richlynn was extremely professional and worked quickly to make our basement dreams come true! The crew was respectful of our home and was flexible in making adjustments based on our vision. We would recommend Richlynn to anyone looking for a remodel!"
beginning
New family room and fireplace
Living room
Old family room
hallway

+304

Response time1 day
Response rate93%
8 neighbors recently requested a quote
Avatar for RTP Construction, LLC
RTP Construction, LLC
4.7(
27
)
Basement - Remodel

Serving Parker, CO and surrounding areas

Approved

In business since 2014

Free estimates

Warranties offered

"Rick did a fantastic job on our basement. His bid was middle of the road for our basement remodel among many bids and he managed to complete it in a timely manner and it looks amazing! I would recommend him for any remodel job. Also just a note, our basement flooded a year later due to our main sewer line backing up and he came out to fix a ton of work that was ruined on very short notice over the holidays and worked with us on pricing. He s great!"
Basement Finish 1
Kitchen Added in Basement
Basement Finish from house built in 1975
Redwood Deck
Basement Wet Bar - No Flooring installed Yet

+4

Response time1 day
Response rate85%
2 neighbors recently requested a quote
...
Showing 1-10 of 613
Basement Remodel questions, answered by experts

If you have the woodworking experience to build a bar from scratch and you have the time, DIYing the work is a no-brainer and can save a few thousand dollars. However, if you’re looking to include a sink, additional lighting fixtures, or high-end bar tops and cabinets, it’s usually a better idea to call in a pro. It will cost more, but the finished product will likely be worth it.

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

In addition to overseeing new home builds, construction managers work on large renovations and major remodels. For example, they may work with designers and oversee the construction of a finished basement, kitchen renovation, or a home addition. They may also oversee large-scale remodels, such as the update of a historic home. Construction managers step into small projects for more specific assistance, such as building budgets and compiling the team.

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Parker, CO homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.