Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in May Valley, CO

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in May Valley, CO?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in May Valley

Hopkins Construction and Consulting
4.6(
5
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving May Valley, CO and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"Jason and his crew took their time to make sure my job request was done right. Always keeping me informed of the projects progress. They clean up the area after each days work. Top notch people that I would definitely hire again for my driveway work. You can't go wrong!"
Response time2 days
Recommended by100%of homeowners
Avatar for Splash Pools & Spas
Splash Pools & Spas
5.0(
2
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving May Valley, CO and surrounding areas

In business since 2018

Free estimates

Small jobs welcome

Splash Pool and Spas is a full service pool company. We sell and install inground swimming pools. Splash Pools provides Fair prices, Superior Quality and Exceptional customer service are guaranteed when you work with us. Give us a call and we can get started on your Oasis in your back yard. Splash Pools also provides service and repair. Don't worry we can service and repair all types of pools and spas. Weather we are installing your new Liner or Replacing your cover. We have the experience and skills needed to get the job done.\n Available mon-sat 7-7

Garden City Pool
Dodge City Pool
Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 26
Asphalt Driveways questions, answered by experts

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

Driveways should be sloped with a minimum 2% slope—anything lower will cause precipitation and runoff to collect. A 2% slope is the equivalent of a 2-foot rise over 100 feet. One quick way to check the integrity of your driveway’s slope: no more than four inches of water should collect on the surface longer than 15 minutes after rain.

Asphalt edging secures the sides of your driveway to prevent crumbling and cracking over time. Most driveways have edges with a 45-degree grading. This helps transfer some of the stress from the asphalt to the ground underneath. If your driveway doesn’t have proper edging, the pressure from your car may break down the edges over time.

Since it has a smoother surface using a mixture of finer rock and sand, 41A tends to be the best asphalt grade for a driveway, especially for residential driveways. Other options are available, but more homeowners choose 41A for a smoother asphalt driveway. Talk with your asphalt driveway professional for recommendations of the best grade for your specific driveway.

The May Valley, CO homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.