Top-rated excavation pros.

Get matched with top excavation pros in Johnstonville, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Johnstonville, CA?

Select your specific project to find the pro for you.

Find Excavation pros in Johnstonville

Yee Landscape Construction
New to Angi
Landscape - Minor Grading or Resloping

Serving Johnstonville, CA and surrounding areas

In business since 2001

Yee Landscape Construction specializes in all aspects and phases of landscaping and irrigation services. We have over 20 years of combined construction experience serving hundreds of satisfied customers. We offer integrity, quality, and on time services with every project that we take on. Call us today for more information on all of our services.

Excavating questions, answered by experts

No, you typically cannot use metal detectors to find your sewer line. Most sewer lines are made of non-metallic materials such as PVC, clay, or cast iron, which are not detectable by standard metal detectors. Metal detectors are designed to locate metallic objects, so they won't be effective for identifying the path of a non-metallic sewer line. To locate your sewer line accurately, it's best to use other methods.

There are several different factors that influence how long it takes to excavate. For a foundation, it could take anywhere from three days to three weeks. It can take even longer if you face weather-related delays or an inaccessible site that’s riddled with boulders and rough terrain. It may also take longer if you have clay soil, which is more difficult to dig.

If you don’t have a crawl space but have a partial basement you want to make deeper, you can expect to spend a little less—between $40,000 and $90,000 on average. However, if you’re not adding new finished square footage, you won’t see much in the way of ROI.

Directional drilling is complex and requires training to use the advanced machinery. It can be challenging to monitor the position of the drill since there’s no direct line of sight. Directional drilling can also be more expensive with a cost of $10 to $30 per linear foot compared to $5 to $12 per linear foot for trenching. 

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.