Top-rated basement remodelers.

Get matched with top basement remodelers in Dunnigan, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Dunnigan, CA?

Select your specific project to find the pro for you.

Find Basement remodelers in Dunnigan

Avatar for Waters Construction Co.
Waters Construction Co.
5.0(
5
)
Basement - Remodel

Serving Dunnigan, CA and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"I’ve worked with Mike and his team for years on all kinds of projects, and they’ve always been amazing to work with. The quality of their work is top-notch, they stay on budget, and everything runs smoothly from start to finish. Their design sense is excellent and they always manage to get things done right on time. I can’t recommend them enough, truly a reliable, talented, and easy-to-work-with crew."
Kitchens
Kitchens
Kitchens
Kitchens
Kitchens

+14

Response time6 hrs
Response rate100%
Avatar for Clear Horizon Home Solutions, Inc.
Clear Horizon Home Solutions, Inc.
4.3(
214
)
Basement - Remodel

Serving Dunnigan, CA and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"We love working with Benjamin and his crew . His professionalism is unmatched. He gave us a great price for the bathrooms remodel. The outcome was amazing and better than expected! I would highly recommend Expert Home Builders to my friends."
1
2
3
Kitchen Remodels
2

+2

Recommended by82%of homeowners
Avatar for Mega Power Electric, Inc
Mega Power Electric, Inc
5.0(
191
)
Basement - Remodel

Serving Dunnigan, CA and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"Excellent Service from planning through Execution and installation to final fine tuning. The folks communicated well and explained every detail of the step. Got permit and inspection done. It was seamless. Thanks. R."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+32

Recommended by100%of homeowners
Avatar for 4 Corners Construction inc.
4 Corners Construction inc.
5.0(
14
)
Basement - Remodel

Serving Dunnigan, CA and surrounding areas

In business since 2019

Free estimates

Emergency services offered

"Glenn remodeled a section of my mother’s house who has multiple handicap needs. He personally made sure every detail worked for her. The attention to detail was extensive. I appreciate Glen and the Four Corners Construction guys. Thank You"
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Additional Photos

+141

Recommended by100%of homeowners
Avatar for KTD Construction
KTD Construction
5.0(
8
)
Basement - Remodel

Serving Dunnigan, CA and surrounding areas

In business since 1994

Free estimates

Emergency services offered

"KTD is simply the best I have seen. I have over 20 years experience in both residential and commercial property development/remodeling in multiple cities throughout california, thus I have worked with many skilled tradesman. However KTD is by the far the best skilled craftsman I have ever seen or had the pleasure to work with, and will work again with when other projects are given the green light. KTD is simply the best at what they do."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
Avatar for RG Construction
RG Construction
5.0(
8
)
Basement - Remodel

Serving Dunnigan, CA and surrounding areas

Free estimates

Emergency services offered

Warranties offered

"I had RG Construction come out to give me a bid to build an ADU on the side of my home. Richard, the owner of the company, was a great guy and easy to talk to. When discussing my vision for my ADU, Richard was super polite and listened to everything I had to say. He recommended me some ideas, while still trying to incorporate what I wanted. RG Construction’s bid was higher than some of the other bid’s I got, but I went with them because after having a talk with Richard, he felt very trustworthy and made me feel safe with my investment. He was very responsive throughout the entire project, answered all the questions I had and made sure I was completely happy with the work performed. I’m picky when it comes to choosing a contractor and I can confidently say, I would give RG Construction 10 stars if were possible. Great owner, great team and great work."
Full Kitchen Remodel
Response time1 day
Response rate100%
Showing 1-10 of 36
Basement Remodel questions, answered by experts

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

Renovations that add functionality or more comfortable floor space generally add the most value when remodeling your home. Attic or basement finishing can add floor space without altering the home's structure, saving you renovation money while adding valuable space. Smaller improvements, such as installing smart-home components or replacing entry doors and windows, also experience high ROIs. 

Renovation enhances functionality, increases home value, and can add new space for personal or family needs. It typically modernizes older unfinished basements for new uses.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

To determine if your basement walls are suitable for finishing, assess their structural integrity and moisture conditions. Look for any signs of damage, such as cracks, bowing, or excessive moisture. Ensure proper drainage and address any underlying issues before proceeding. 

Consult with a professional if you're uncertain about the structural stability or potential risks associated with finishing your basement walls.

The Dunnigan, CA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.