Top-rated generator install pros.

Get matched with top generator install pros in Anaheim, CA

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Anaheim, CA?

Select your specific project to find the pro for you.

Find Generator install pros in Anaheim

Avatar for Quality Electric Corp
Quality Electric Corp
5.0(
17
)
Fixed Generator - Install

Serving Anaheim, CA and surrounding areas

Approved

Super Service Award Winner

In business since 2014

Free estimates

Credit card accepted

"Quinn was professional and courteous. In addition to the EV charger installation, he also installed 2 new circuits with breakers and new conduit. All the work looked amazing and he and his associate cleaned up everything when they were done. Couldn’t have been happier with the work done. Would highly recommend Quality Electric."
Response time3 hrs
Response rate97%
1 neighbors recently requested a quote
Avatar for ZERO ELECTRIC
ZERO ELECTRIC
4.9(
10
)
Fixed Generator - InstallGenerator - InstallGenerator - Install - For Business+1 more

Serving Anaheim, CA and surrounding areas

Approved

Super Service Award Winner

In business since 2021

Free estimates

Credit card accepted

"Highly Recommended! We have hired Zero Electric to do several jobs at our apartment complex including installing a generator, EV chargers, new panel, and even installing recessed lighting in the units. They handled all aspects of the projects and had top notch communication throughout. The team has always been quick and professional. We will continue using Zero Electric for our electrical needs."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

1 neighbors recently requested a quote
Recommended by70%of homeowners
Western Sunset Builders
4.6(
14
)
Fixed Generator - InstallFixed Generator - RepairGenerator - Install+4 more

Serving Anaheim, CA and surrounding areas

Approved

In business since 2009

Free estimates

Emergency services offered

"Very happy with the work completed by Bill (owner), Josh and Pat. Bill always responds promptly to text and calls and explains things clearly. Provided free quote and visited the house to confirm quote. Josh and Pat arrived on time and worked neatly. Josh was able to avoid trenching thru the ceiling even though attic space was limited. They even put back closet shelf that had to be removed to access attic. Josh and Pat even came by another day to help install a remote that I did not have on the day of installation."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+30

Response time10 hrs
Response rate100%
1 neighbors recently requested a quote
...
Showing 1-10 of 238
Generator Install questions, answered by experts

A 1,500 square foot home will likely need a 15kW to 20kW generator. When deciding on whole-house generator size, add up the total wattage of the devices that you’d like to continue running during a power outage. That way, you can ensure you purchase a generator that can power your necessary appliances or medical equipment during an electrical emergency.

The average cost to install a home generator is $5,200, but total costs can range from $500 to $18,000 or more. The final price depends on several factors, including the generator's size, type, brand, fuel source, and the cost of labor and assembly. The generator's size is the most significant cost factor, as units that can power larger homes with higher energy demands cost more.

Cost breakdowns by generator type are typically as follows:

  • Portable or Emergency Backup Generators (1kW–7.5kW): $500–$2,000

  • Partial-Home Generators (9kW–20kW): $2,000–$6,500

  • Whole-House Generators (22kW–48kW): $5,000–$18,000

To ensure you get the right size unit for your needs without overpaying, consider hiring an electrician to calculate the electrical load of your essential appliances. It is also recommended to get at least three quotes from qualified installers to find the best fit for your budget.

Many services include assembling the unit and securing it in the window. Confirm with your provider.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

These advanced generators use a key fob or a smartphone app to remotely start, which is ideal for getting power back on immediately without venturing outside. This feature is more common on whole home generators, but you may be able to find it on large portable generators, too.

The Anaheim, CA homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.