Top-rated rototilling pros.

Get matched with top rototilling pros in Foreman, AR

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Foreman, AR?

Select your specific project to find the pro for you.

Find Rototilling pros in Foreman

Avatar for TruGreen

TruGreen

3.73(
2,161
)
Approved Pro

TruGreen

3.73(
2,161
)
Approved Pro
Customers say: True professional
51 years of experience
Free onsite estimate

We believe life is better outside. TruGreen is committed to improving outdoor spaces like your backyard, our shared communities and the environment as a whole. That's why TruGreen, America's #1 lawn care company, has a team of PhD agronomists and certified specialists who work to provide tailored care and bring out your lawn's full potential. We're here to help you and your lawn flourish this season.

"The pro has been servicing our Mclean property quite well for a couple of years. Our lawn looks good and we are satisfied with the service. The customer service is sometimes underwhelming but it gets the job done at a reasonable cost which is really becoming harder by the day to get."

Alejandro S on May 2025

We believe life is better outside. TruGreen is committed to improving outdoor spaces like your backyard, our shared communities and the environment as a whole. That's why TruGreen, America's #1 lawn care company, has a team of PhD agronomists and certified specialists who work to provide tailored care and bring out your lawn's full potential. We're here to help you and your lawn flourish this season.

"The pro has been servicing our Mclean property quite well for a couple of years. Our lawn looks good and we are satisfied with the service. The customer service is sometimes underwhelming but it gets the job done at a reasonable cost which is really becoming harder by the day to get."

Alejandro S on May 2025



Rototilling questions, answered by experts

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

An aboveground pool should be level within 1 inch—and it starts to become unsafe after a couple of inches. Any slope will lead to an uneven distribution of water, which will put pressure on your pool’s structure, wearing down the pool liner. In certain cases, it could cause your pool to collapse. Even if you’re within a safe window, you may still notice that the water level is uneven.

Yes, you can rent a rototiller for around $60 per day and do the work yourself, but it’s not recommended. Tilling is more of an art than a science, as tilling too deep can be detrimental to your soil structure and the organic matter that is beneficial to plants and shrubs, and tilling too shallow won’t properly introduce fertilizer or break up the soil for rooting plants. Additionally, tillers are powerful machines with sharp blades to cut through small roots and soil, so they are inherently dangerous to use. It’s usually worth it to hire a professional rototiller.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Mobile homes need releveling every so often to maintain their structural integrity. Most mobile home manufacturers recommend releveling every three to five years. To keep the quality of your mobile home up for years and to avoid deterioration over time, proper maintenance is key.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"