Top-rated concrete resurfacing pros.

Best concrete resurfacing pros near Millry, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete resurfacing project in Millry, AL?

Select your specific project to find the pro for you.

Top-Rated Concrete resurfacing pros in Millry - Updated Nov 2026

Avatar for Bay Construction and Concrete LLC
Bay Construction and Concrete LLC
New to Angi
Concrete Flatwork - Repair & ResurfaceConcrete Flatwork - Repair & Resurface- For Business

Serving Millry, AL and surrounding areas

In business since 2022

Free estimates

We offer a variety of concrete services. We guarantee your satisfaction, and we won’t leave until the job is done right. We pride ourselves on the quality of work we provide, while delivering great customer service! Check out all the services we offer below and call -or- click to schedule an estimate today! \n

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+11

Showing 1-10 of 12
Concrete Resurfacing FAQs, answered by experts

The best—and most popular—time of year to resurface a concrete driveway is the late spring. Concrete damage often peaks in the winter as the ground freezes and thaws. Waiting until late spring allows the ground to soften fully, so you don't run the risk of more damage from a sudden cold snap.

If your concrete steps have crumbled or chipped, you can fix them by removing any chips or flakes, cleaning and wetting the affected area, applying a concrete bonding agent, and finally applying new concrete, usually in the form of Portland cement. For widespread damage, you can consider concrete resurfacing instead. For fixing concrete spalling that has led to deep damage, you might need to remove damaged material, add structural supports, and pour new concrete into a mold.

Yes, you can pour new concrete over an existing concrete patio. This process, known as resurfacing, is a common repair method used by professionals. For the best results, ensure the old concrete surface is clean and free from debris. The new layer of concrete should be at least three to four inches thick and include reinforcement materials, such as fiberglass fibers or wire mesh, to prevent cracking and spalling. With proper technique, a resurfaced patio can last for 15 to 20 years.

While you don’t technically need to grind concrete before resurfacing, it is very helpful. Grinding creates a rough, porous surface on the concrete, which gives the resurfacing material something to latch onto. Grinding your concrete before resurfacing can ensure that your resurfacing material lasts longer, reducing additional concrete resurfacing costs down the line.

Mudjacking is suitable for sidewalks, driveways, patios, and nearly all exterior flat structures. However, it may not suit severely damaged or heavily cracked areas.

The Millry, AL homeowners’ guide to concrete resurfacing

From average costs to expert advice, get all the answers you need to get your job done.