Top-rated home builders.

Get matched with top home builders in Logan, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your home building project in Logan, AL?

Select your specific project to find the pro for you.

TRUSTED BY LOGAN, AL HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon25
    Verified home building services reviews

Find Home builders in Logan

Avatar for Beta Pro Services
Beta Pro Services
5.0(
5
)
Shelter or Outbuilding - Build

Serving Logan, AL and surrounding areas

Approved

In business since 2010

Free estimates

Emergency services offered

"The crew did an amazing job! They communicated with me throughout all aspects of the remodel and they took my feedback into consideration. I highly recommend them and will be hiring them for all my future needs!"
Electrical Project
Remodeling - Kitchen & Bathroom Project
Tree Service Project
Remodeling - Kitchen & Bathroom Project
Masonry Project

+43

Response time3 days
Response rate94%
7 neighbors recently requested a quote
Dubberly General Contractors, Inc.
3.1(
5
)
Find a Custom Home Builder

Serving Logan, AL and surrounding areas

Approved

In business since 1976

Free estimates

Credit card accepted

Dubberly General Contractors, Inc., is a locally owned and operated company, that provides full service construction, to a wide variety of customers. We accommodate every facet of construction, with unrivaled professionalism. We are family owned and operated, since 1985, and we take every project as serious as if they were apart of the family. Please feel free to give us a call, we are looking forward to working with you!

Recommended by100%of homeowners
Rent-A-Man
4.7(
55
)
Shelter or Outbuilding - Build

Serving Logan, AL and surrounding areas

In business since 1994

Emergency services offered

Credit card accepted

"After he figured out where the leak was coming from, he found that the whole faucet needed to be replaced. Had to travel 15 minutes away just to get a new one.  Cleveland is a very little town. I had an appointment so I had to leave him by his self to complete job. When I got back home everything was done and it looked good and no longer leaks. Thank you so much.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by94%of homeowners
Showing 1-10 of 38
Home Building questions, answered by experts

A carriage house is a freestanding building, while a townhouse is connected to other units. A townhouse is a full single-family home and typically shares a parcel of land with other connected homes. A carriage house is rarely used as the sole single-family home on a property and is most often an additional building sharing property with a traditional single-family home. 

The primary reason homes have crawl spaces is so the foundation can reach down below the frost line to avoid dangerous soil movement and structural damage when the ground freezes. They’re more popular in colder climates where the ground freezes down to a few feet, and slabs are most popular in warmer areas where there is no frost line. Crawl spaces also provide a space for utility lines to run where they’re at less of a risk of freezing.

Modular homes are a type of prefab home. Specifically, manufacturers first build modular homes in sections and then deliver them to the job site. The modules, or sections, are usually at least 70% finished before they arrive on your property.

In comparison, prefab homes arrive in panels or segments, and workers assemble them on-site. Generally speaking, modular homes tend to be more durable, and their consistent construction standards may mean you’ll have an easier time getting conventional home loans.

A contractor can install your shipping container home in as little as 90 days. This is notably quick compared to a traditional home build, which can take more than a year (providing there aren’t permitting or construction delays that make the wait even longer). For the quickest installation, choose a prefab container home.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

The Logan, AL homeowners’ guide to home building services

From average costs to expert advice, get all the answers you need to get your job done.