Top-rated subcontractors.

Get matched with top subcontractors in Kinsey, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Kinsey, AL?

Select your specific project to find the pro for you.

TRUSTED BY KINSEY, AL HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon377
    Verified subcontracting services reviews

Find Subcontractors in Kinsey

Avatar for Dreams Come True Cabinetry
Dreams Come True Cabinetry
5.0(
2
)
Major Home Repairs (General Contractor)

Serving Kinsey, AL and surrounding areas

Approved

Credit card accepted

"He was on time and at budget. He finished the job. There were no issues on my end. It was fantastic. It was well-costumed. He did everything that I asked him to do. He wasn't the cheapest but he was good. He was worth every dollar that I spent."
Bass resident Bathroom
Bass resident Bathroom
Bass resident Bathroom
Grimes carport addition
Grimes carport addition

+34

Response time2 days
17 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Foundation Repairs & Home Improvements Inc
Foundation Repairs & Home Improvements Inc
4.6(
63
)
Major Home Repairs (General Contractor)

Serving Kinsey, AL and surrounding areas

In business since 1972

Free estimates

Credit card accepted

"This company is owned and run by "old school" professional people who do what they say they will do. Everyone from the office staff to the crew that did the work to the owner Greg McBride were wonderful to work with. I wish I had know about them 4 years ago and I would have used them for everything in and around my home. I trust them and will use them in the future."
Before
After
After
Additional Photos
Additional Photos

+20

Recommended by91%of homeowners
Klein and Son Construction and Excavating
3.9(
50
)
Major Home Repairs (General Contractor)

Serving Kinsey, AL and surrounding areas

In business since 1980

Free estimates

Emergency services offered

"They are very professional, and go above and beyond for their customers!
Mr. Klein was very helpful, came over when insurance adjuster was here, to help with questions I wouldn't of thought of. 
They were always prompt, friendly, cheerful and courteous, and let me know what they were doing and why. 
I have not had a problem with leakage since they fixed the roof, and would and will call them again when something need replaced or fixed in my house. 

"
metal roof
Kitchen
Railings
Recommended by74%of homeowners
Showing 1-10 of 43
Subcontractors questions, answered by experts

Costs depend on desk size, labor, included features like drawers or motorized height adjustments, and required wall anchoring.

Yes, you can draw your own deck plans in many cases. However, you must know your local building codes and be familiar with carpentry principles. Even then, it's always best to run your plans by a professional contractor with experience building decks, whether you choose to DIY some of the build or not.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

There are several different steps in the pole barn building process. First, you’ll need construction plans, which you’ll use to obtain permits. Then, you can clear the land so it’s suitable for building and installing the foundation. Your contractor will frame the barn using large poles, then rough in the plumbing and electricity (if your barn has those elements) before finishing the interior, adding siding, and installing the roof. 

After that, they’ll finish up the electrical work and plumbing and add your windows and doors. You may have a few other finishing jobs to do like painting or waterproofing.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

The Kinsey, AL homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.