Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Jackson, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Jackson, AL?

Select your specific project to find the pro for you.

Find Backsplash installation pros in Jackson

Avatar for Jamison Flooring LLC
Jamison Flooring LLC
4.9(
18
)

Serving Jackson, AL and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Customers say: True professional

"Installation of vinyl laminated flooring was excellent. Jamison Flooring did everything as contracted. They were prompt and very professional. I highly recommend their services."
Flooring Installation Project
Tile Backsplash and Laminate Floor Installation
Ceramic Tile Project
Ceramic Tile Project
Flooring Sales/Installation/Repair Project

+131

Response time8 hrs
Response rate100%
4 neighbors recently requested a quote
Complete Home Repair
4.9(
38
)

Serving Jackson, AL and surrounding areas

In business since 1995

Free estimates

"Mr Webb's work is very good and my wife and I are very pleased with his work, cost and work time.  We have used Complete Home Repair for several small repairs this year and have always been very pleased.  He shows up when he says he will and gets the job done.  So when we planned this latest project, we did not hesitate to call them and in fact did not even think about any one else.
We have in mind some other projects around here and will certainly call them first.  We found Complete Home Repair on Angie's list and have even found others for HVAC etc.
"
luxury
warmth
durable
Recommended by93%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)

Serving Jackson, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Jackson, AL and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Showing 1-10 of 30
Backsplash Installation questions, answered by experts

Bathrooms are naturally moisture-rich environments, so choose a durable, water-resistant tile for your tub surround. Porcelain and ceramic are two popular options that are also quite affordable. Glass is another good option that’s also low-maintenance—you just need a glass cleaner like you would use on the bathroom mirror. Natural stone tile is porous, but it’s still a viable option if you choose it in a glazed version.

Tile floor installation usually takes about 16 hours of active work along with a couple of days of drying time between tile and grout applications.

The amount of time it takes your installer will depend on many factors, including the square footage of the space, the tile material type, and if they need to make intricate tile cuts.

Yes, tile floor removal is a physically demanding project that takes between eight and 12 hours per 100 square feet. It also requires protective gear and closing the area off with construction-grade plastic sheeting to avoid dust and damage to other parts of your home.

The lifespan of bathroom tile can be 50 years or more, depending on proper installation and regular maintenance. A well-done tile job, whether it's a new installation or a retiling project, can last for many decades. To lengthen the life of your tile, it's best to have it installed by a professional and to perform regular maintenance. This includes routine cleaning, resealing, and regrouting as needed. With proper care, you can expect your tile to last 10 years or more before needing major repairs or retiling, especially in high-traffic areas where tiles can wear out more quickly.

Yes, you can install a backsplash directly onto drywall, provided the wall is properly prepped, clean, and dry. For best results, especially in kitchen areas, your walls should be made of moisture-resistant drywall, often called green board. If your current wall isn't moisture-resistant, it's recommended to replace it before installing the backsplash. For even greater protection against water damage, you can remove the existing drywall and install a tile backer board or cement board instead. While properly installed standard drywall is typically strong enough to support a backsplash, some local building codes may require water-resistant materials in kitchen areas, so it's a good idea to check.

The Jackson, AL homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.