Top-rated contractors.

Get matched with top contractors in Carrollton, AL

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Carrollton, AL?

Select your specific project to find the pro for you.

Find Contractors in Carrollton

Avatar for Dearman Construction LLC
Dearman Construction LLC
5.0(
7
)
Major Home Repairs (General Contractor)

Serving Carrollton, AL and surrounding areas

In business since 2019

Free estimates

"Dearman construction did not disappoint! Very punctual! By far the best customer service and their experience and knowledge of the job requested was outstanding, if you need ANYTHING done from roofing, decking to tile Dearman Construction are the people to go to! Would recommend this business to anyone looking for top notch contractors. Would refer these people to my own family!"
Before picture while poles were going in the ground
New Deck
Stairs
New Deck
New deck

+17

Recommended by100%of homeowners
Avatar for Halo Construction LLC
Halo Construction LLC
4.3(
73
)
Major Home Repairs (General Contractor)

Serving Carrollton, AL and surrounding areas

In business since 2008

Free estimates

Emergency services offered

"Kristy,James and his men were a pleasant company to talk to and did excellent work. They had done some previous work for me a year ago that turned out great so I had no problem what so ever contacting him and his company again for this project. The work was great and looked better than I had expected it to look. I like James because he is honest and will give advice on a project if you ask it. The job was completed in the time he had said and was on budget. Cant wait to start using my new deck this summer. will use them again if I have anything else come up."
Additional Photos
Additional Photos
Darker Tile
Lighter Tile
Recommended by85%of homeowners
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)
Major Home Repairs (General Contractor)

Serving Carrollton, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Showing 1-10 of 30
Unfinished Carpentry questions, answered by experts

Yes, using certified lumber and engineered wood products for reduced environmental impact.

For maximum stability, install grab bars on wall studs, as this will adequately support the weight. However, if you don't have access to studs, you can get by with wall anchors. If opting for the latter, choose specialty hollow wall anchors. 

There are a few easy ways to locate a wall stud without a stud finder. First, try knocking on the wall with your knuckles. Most parts of the wall will sound hollow, but when you tap over a stud, it will sound more solid. Alternatively, since studs are spaced 16 or 24 inches apart, you can measure those distances from a corner of the room, which will always have a stud.

There are approximately 5.33 board feet in a 2x4. You can use the board foot calculator in this article to easily find the answer. A 2x4 is 2 inches of thickness by 4 inches of width, so you need to find the length, with 8 feet being the most common. You’d use the calculator here to multiply 2 times 4 times 8, and then divide by 12, arriving at a total of 5.33 board feet. 

In framing, studs are placed at 16-inch intervals to coincide with the typical spacing of wall materials such as drywall or plywood. This spacing is called "on-center" and is necessary for maintaining structural stability and efficient use of materials. The 16-inch spacing also helps to distribute the weight evenly across the building's structure. For those looking to cut material costs and improve energy efficiency, 24-inch stud spacing can be employed through a method called "advanced framing". This requires careful planning and adherence to local building codes to ensure structural integrity.

The Carrollton, AL homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.