Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Lingle, WY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Lingle, WY?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Lingle

Avatar for Open Country Garage Doors & Gates
Open Country Garage Doors & Gates
5.0(
5
)
Gate for Driveway or Security - Install or Replace

Serving Lingle, WY and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"I've been using Open Country for garage door installs on new construction, as well as service calls for doors on rental properties and could not be happier with the service. The team is knowledgeable, prompt, and fantastic communication from both office staff and the field team. I love the electronic billing ability and lack of mail and paperwork. Highly recommended!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+88

Recommended by100%of homeowners
Avatar for LB Concrete LLC
LB Concrete LLC
4.5(
2
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Lingle, WY and surrounding areas

In business since 2024

Free estimates

Credit card accepted

"He was really professional. Told me exactly what he was going to do and broke the invoice down and showed me exactly where my money was going. He was on time got the job done exactly how he said he was going to. Cleaned up after the job was done and left my place better then when he got there. I will be using him for other projects in the future. Highly recommend him and his crew."
Side walk
Side walk
Side walk
Side walk
Response time10 mins
Response rate100%
Avatar for M & M sealcoat driveways - Acas  Facebook
M & M sealcoat driveways - Acas Facebook
New to Angi
Asphalt Paving - Repair or PatchAsphalt Sealing

Serving Lingle, WY and surrounding areas

In business since 2012

Free estimates

Warranties offered

M & M Seal Coating is a family owned and operated company that values honesty and integrity in all aspects of our business. Our dedicated team of professionals have over 9 years of hands on experience to provide innovative ideas and suggestions tailored to your projects. Our services are customized to your individual needs, paying close attention to the details of each project that we are involved with. Please feel free to contact us today!

Response time8 hrs
Response rate86%
Avatar for Cowboys Concrete
Cowboys Concrete
New to Angi
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Lingle, WY and surrounding areas

In business since 2005

Free estimates

Offers commercial services

We are a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We have many years of experience to give you confidence that we are your number one choice for your next home project. You will find us to be competitively priced with close attention to the details. We look forward to building a lasting relationship and guarantee your satisfaction!

Response time1 hour
Response rate89%
Showing 1-10 of 19
Asphalt Driveways questions, answered by experts

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

Asphalt and tarmac are not the same thing. Traditional tarmac, short for tarmacadam, uses tar as a binder to hold crushed stone together. Asphalt uses bitumen—a byproduct of crude oil—to bind aggregate. Though tarmac was once a go-to for roads, asphalt has become the modern standard. And these days, most surfaces referred to as “tarmac” are actually asphalt. So, while the names may overlap, the key distinction lies in the binder—tar for tarmac and bitumen for asphalt.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Whether you should resurface or replace your asphalt driveway heavily depends on its condition. If the foundation is solid and the damage is minor, resurfacing is your best bet because it’s more affordable and faster than replacing the driveway. But if your driveway has foundational problems and/or severe damage, like large, deep cracks and potholes, then it makes more sense to replace it. 

You should contact your driveway installer before winterizing a newly installed driveway. Winterizing it before the asphalt or concrete has fully cured can damage the driveway. But in many cases, you don't need to winterize a newly installed driveway anyway since it's likely freshly sealed and won't have much damage yet. 

The Lingle, WY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.