Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Kinnear, WY

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Kinnear, WY?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Kinnear

Avatar for LB Concrete LLC
LB Concrete LLC
4.5(
2
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Kinnear, WY and surrounding areas

In business since 2024

Free estimates

Credit card accepted

"He was really professional. Told me exactly what he was going to do and broke the invoice down and showed me exactly where my money was going. He was on time got the job done exactly how he said he was going to. Cleaned up after the job was done and left my place better then when he got there. I will be using him for other projects in the future. Highly recommend him and his crew."
Side walk
Side walk
Side walk
Side walk
Response time10 mins
Response rate100%
Concrete Mudjacking questions, answered by experts

The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

The method involves lifting settled concrete using pressurized cement slurry via drilled holes. This solves uneven surfaces and prevents further settling.

The average cost for mudjacking is around $1,200, though prices can range from $300 to $3,400. On a per-square-foot basis, you can expect to pay between $3 and $8, with an average of about $5 per square foot. The final cost depends on several factors, including the square footage of the concrete, the type of slab, its accessibility, whether it is load-bearing, and the type of material used to lift it. Generally, lifting a driveway, small patio, or sidewalk is less expensive than lifting a slab foundation or garage floor.

Charges correlate with surface size, settlement depth, and access, often yielding significant savings over concrete replacement.

The Kinnear, WY homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.