Top-rated subcontractors.

Best subcontractors near Kemmerer, WY

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Kemmerer, WY?

Select your specific project to find the pro for you.

Top-Rated Subcontractors in Kemmerer - Updated Nov 2026

Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Kemmerer, WY and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Kemmerer, WY and surrounding areas

In business since 2006

Credit card accepted

"I never contacted the provider or used this service in anyway. I have to
write this review so that the request to write this review stops
popping up.
The rating is bogus as it is required to be able to submit.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for War Construction
War Construction
5.0(
2
)
Major Home Repairs (General Contractor)

Serving Kemmerer, WY and surrounding areas

In business since 2023

Free estimates

Small jobs welcome

"Matt responded to my request quickly, and was able to come that same day. After inspecting my crawl space, he discovered I had a long-standing water leak that had run into the insulation under the house, and was degrading the foundation. He fixed the leak; removed and hauled away the soaked insulation; installed new insulation; reinforced the foundation where it had started to crunble; ran a French drain away from the foundation in case of future leaks; and treated mold on the floor joists. Matt is very good at what he does, reasonably priced and easy to work with. I would highly recomend him."
bathroom remodel
Insulation
Light fixture, replacement
ceiling fan in bathroom
progress

+49

Response time3 hrs
Recommended by100%of homeowners
Showing 1-10 of 21
Subcontractors FAQs, answered by experts

Balancing aesthetics with functionality amidst space planning is important. To do so, you could consider consulting both an interior designer and an architect to fulfill both these needs. Or you can tackle it on your own by prioritizing personal touches amidst space planning that add to the look but don't take away from the livability of the space.

The most common scale for residential blueprints is 1/4 of an inch equals one foot. This scale is the most popular because it’s easier for everyone involved, from professionals to homeowners, to understand the building’s actual dimensions. Also, it allows blueprints to have the necessary details without cluttering the page.

Costs vary depending on project complexity and scope. Architects generally charge a percentage of the total budget or an hourly rate for their services.

While you will always work with a team of professionals at some point during your home build, homeowners with experience can take on some part of the process. Manage the initial brainstorm, brief writeup, and floor layout phase with minimal assistance before contacting a general contractor. And while you can purchase stock blueprints for some home designs, it's always best to speak with professionals when choosing one ideal for your property.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

The Kemmerer, WY homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.