"Iron mountain was a great company to work with. They poured retaining walls, new concrete steps and sidewalks at my commercial building and the work is beautiful. They were great with the required schedules, performing work professionally, and keeping the job site cleaned up. I highly recommend them and will continue to use them on future projects."
"This company is very professional, Their job site was clean and the finished product was excellent. They tore out and replaced a existing sidewalk. WOULD USE THEM AGAIN WITHOUT QUESTION"
Reliable, detail-driven contractor with a strong work ethic and a reputation for getting the job done right the first time. I specialize in excavation, site prep, landscaping, hardscaping, and concrete work, bringing both skill and precision to every project? Big or small.
With several years experience, we work hard to bring each customer the best possible service and quality available. We look forward to working with you on your next project. We welcome your questions and thank you for your interest. Call today! \nCheck us out on Google!\nhttps://share.google/folKc4us5mWtTNjPR
Ostermiller Construction LLC in Shepherd, MT specializes in concrete, asphalt, curb, driveway, walkway, sidewalk, parking lot construction, and dirt work. We offer free estimates.\n\nWe serve in Shepherd, MT, Broadview Town MT; Roundup MT; Camp Three MT; Klein MT; and the surrounding areas.\n\nAsphalt Repair, Asphalt Contractor, Asphalt Driveway Repair, Asphalt Crack Repair, Parking Lot Asphalt Repair\nConcrete Service\n\nFor more information visit our website: https://constructionshepherdmt.com/
"I only use James when I need some work done to my house. He responds fast, gets the work done quicker than just about anyone else I've ever used and seems very concerned with leaving his customers happy."
New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.
During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.
The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.
Asphalt and tarmac are not the same thing. Traditional tarmac, short for tarmacadam, uses tar as a binder to hold crushed stone together. Asphalt uses bitumen—a byproduct of crude oil—to bind aggregate. Though tarmac was once a go-to for roads, asphalt has become the modern standard. And these days, most surfaces referred to as “tarmac” are actually asphalt. So, while the names may overlap, the key distinction lies in the binder—tar for tarmac and bitumen for asphalt.
While paving a driveway is possible to do as a DIY project, we don’t recommend it. Hiring a driveway professional to pave it will ensure that your driveway looks neat and clean and lasts for years to come, and it will also prevent a weak driveway and, potentially, damage to your foundation. Paving a driveway requires heavy machinery, and while you can rent the equipment needed, operating it close to your garage slab or around your home’s foundation can crack it and lead to structural issues.
With proper maintenance, asphalt milling driveways can last 30 years or more. Over time, you’ll need to regularly sealcoat your driveway. You should also have your driveway inspected every few years and make any repairs as soon as they are necessary; this will prolong the lifespan of your driveway.
Yes, you can retrofit an existing driveway, but this usually involves cutting grooves into the driveway, installing the heating elements, then sealing them. While this is much less expensive than typical heated driveway systems, the final appearance could be diminished. Speak with a driveway paving company to confirm which design method is best for you.
The Kaycee, WY homeowners’ guide to asphalt driveway services
From average costs to expert advice, get all the answers you need to get your job done.
Adding a new asphalt driveway to your home can boost its overall appearance and give homeowners a nice ROI down the line. But how long do asphalt driveways last, and what can you do to maximize their lifespans? Read this guide to find out.