Top-rated basement remodelers.

Get matched with top basement remodelers in Man, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Man, WV?

Select your specific project to find the pro for you.

Find Basement remodelers in Man

Avatar for Alford Home Solutions Inc
Alford Home Solutions Inc
4.4(
70
)

Serving Man, WV and surrounding areas

In business since 1963

Free estimates

Emergency services offered

"They arrived on time and completed the work in a timely manner. I was very pleased with their work. They also installed at an earlier time plastic under my house. They even noticed that insulation work I had done by another contractor was not completed. I called the contractor and told him they noticed his work and he came back and finished the job.  I didn't know it at the time, but they also install insulation. I would use them again."
Termite shelter tube hanging from floor joist.
Termite Damage to floor joist, rim joist and sill plate.
Termite and Moisture Damage to wood in crawl space.
Concrete Work
Recommended by90%of homeowners
Avatar for Machen Home Improvements
Machen Home Improvements
4.0(
77
)

Serving Man, WV and surrounding areas

In business since 1992

Free estimates

Emergency services offered

"I found them on Angie’s List. He showed me pictures of everything and what he took out. He showed me the work and it wasn’t like made up or anything. He took pictures before and after on the roof of the part that was rotten and after he redid it. I was happy with him. I looked afterwards and there was no complaint. They did it in a timely manner, like they said they would. There were rain delays and it wasn’t their problem. They never tried to change the price on me. They cleaned up like nails and stuff in the driveway. I checked the driveway and there weren’t any nails or anything. They did a pretty good job. They did fine and it was a good job. I did have other estimates and they were okay. They called and asked if anything was wrong, and it has been a year. They got delayed and the work got a little hurried but it was damp and they couldn’t get to it. They did everything they were going to do. They didn’t try to cover and not replace certain things to make more profit, and I see all new gutters and everything."
.
.
.
.
.

+117

Recommended by90%of homeowners
Avatar for MCN General Contracting LLC
MCN General Contracting LLC
4.9(
5
)

Serving Man, WV and surrounding areas

In business since 2016

Free estimates

Credit card accepted

"This was truly the best experience I've had in over 40 years of doing home improvements. .this company is first class,the owner and workers were terrific to work with.. Started on time, finished on time,all within budget .. I do recommend them often."
Response time2 days
Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Man, WV and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
JS Vinyl Company, Inc.
5.0(
3
)

Serving Man, WV and surrounding areas

In business since 1975

Free estimates

Emergency services offered

"The work was excellant. They went the extra mile to assue that the installation was perfect and clean. They clean up after they were done for the day. They offered to hang the blinds up on the windows that I had them on. They corrected some items on the outside of the house while putting up vinyl sideing on the eves and carpot. I also had them to put new gutters on the hous. I would highly recomment them. They did an excellant job"
Recommended by50%of homeowners
Randy's Construction
New to Angi

Serving Man, WV and surrounding areas

In business since 1980

Free estimates

At Randy's Construction we make dreams come true. With over 35 years of experience, we do the best work; it�s simply the way we do business. Randy and crew does everything from custom home building and remodeling to small commercial build outs. We offer quality, professionalism and competitive pricing for every job, regardless of project size. Customer satisfaction is our primary goal. Randy's Construction looks forward to making your dream a reality.

Showing 1-10 of 18
Basement Remodel questions, answered by experts

It is generally more affordable to finish a basement than an attic, though it ultimately depends on how you plan to use the space. The average cost to finish a basement ranges from $7 to $23 per square foot, while attic renovation costs $30 to $60 per square foot. However, a simple attic conversion to a storage space will cost significantly less.

The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.

Finishing a basement can provide a great return on investment, by increasing the market price of your home when you want to sell. Beyond that, there are many reasons to finish your basement. Doing so expands the usable square footage of your home, so you can enjoy it more, even as your family grows. Renovating your basement costs less in terms of time, energy, and money than having to search for and buy a new home.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, you can add a bathroom to an unfinished basement, but you’ll want to take proper precautions if doing so. As with any bathroom addition, you’ll need to make sure that it’s approved by local building authorities first. With unfinished basements, you especially need to keep an eye on proper ventilation practices.

The Man, WV homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.