Top-rated rototilling pros.

Get matched with top rototilling pros in Brookhaven, WV

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Brookhaven, WV?

Select your specific project to find the pro for you.

Find Rototilling pros in Brookhaven

Professional Lawn Care, Corp.

No reviews yet

Professional Lawn Care, Corp.

No reviews yet
37 years of experience

Full Service Landscape Contractor Including: Agronomy, Aquaculture-BioMechanical Engineering, Botony, Entomology, Horiticulture, Pathology, Soil & Water Testing, Snow Removal-Limited Pittsburgh, PA Service Area

Full Service Landscape Contractor Including: Agronomy, Aquaculture-BioMechanical Engineering, Botony, Entomology, Horiticulture, Pathology, Soil & Water Testing, Snow Removal-Limited Pittsburgh, PA Service Area



CRIDER BOYS CONTRACTING LLC

No reviews yet

CRIDER BOYS CONTRACTING LLC

No reviews yet
25 years of experience

if you need us call the home number -304-278-7825 any time and from 8 am until 4 pm call my cell number 304-276-2925 and if it is an emergency then we will call you back asap just leave a message for us to respond to

if you need us call the home number -304-278-7825 any time and from 8 am until 4 pm call my cell number 304-276-2925 and if it is an emergency then we will call you back asap just leave a message for us to respond to

Rototilling questions, answered by experts

Typically 1-3 days, depending on property size and terrain condition.

The average cost to have rototilling done on your property is around $250, and most homeowners pay between $100 and $350. The total for your rototilling project will depend on the area you need tilled, the quality of the soil, how many roots and shrubs are in the area, and the accessibility of the area. Anything that increases the time to till your soil—like hard clay soil, small entrances to the area that require the use of smaller tools, and roots running through the ground—will all increase your costs.

People level their yards for practical and cosmetic purposes. If you have a very steep slope in your backyard, you might have a hard time with lawn maintenance. Or, if you want to entertain in the summer but don’t have a flat yard, building a patio would be quite difficult.

When leveling the ground for a pool. If the ground is mostly level, you may be able to simply lay down pavers or pool pads to support the pool. However, you’ll still need to level the ground with sand as a base before adding other materials on top, like crushed gravel.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.