Top-rated subcontractors.

Best subcontractors near Accoville, WV

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Accoville, WV?

Select your specific project to find the pro for you.

Top-Rated Subcontractors in Accoville - Updated Nov 2026

Avatar for Murphy Family Electric
Murphy Family Electric
4.4(
2,222
)
Major Home Repairs (General Contractor)

Serving Accoville, WV and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"It was excellent. Mike was very informative and thorough. Prices were reasonable. They were on time to every meeting time. The best part was how willing they were to work with me with a timeline. They completed the tasks very proficiently."
installing meter base and mast
Dan the man
mast and weather head with guy kit
relocated panel
Family Electricians

+11

Recommended by85%of homeowners
Avatar for Machen Home Improvements
Machen Home Improvements
4.0(
77
)
Major Home Repairs (General Contractor)

Serving Accoville, WV and surrounding areas

In business since 1992

Free estimates

Emergency services offered

"Our home is somewhat different and the job was more involved than either he or we realized at the time, but he was more than able to figure out all the problems and did a much better job than we were even hoping for.  He will be back in the spring for another job for us and also for a job for our son's home.  He and his crew were professional at work and did a very good job."
.
.
.
.
.

+117

Recommended by90%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Accoville, WV and surrounding areas

In business since 2006

Credit card accepted

"

Did a good job, providing 2 layouts to choose from.  Completed design and sent email and snail mail paint and furniture samples in a little over a month from starting the process.  The previous estimate was 2-3 weeks so it wasn't so late.  My only disappointment was the design was not for the complete room.  They told me that the missing area was considered an entry way or hallway and could be designed for an additional fee.  I did not want to pay an additional and accepted their explanation, but on second thought, in my opinion, it isn't really separate.  There is a large archway one-third of the way into the room, but I have never considered it as two separate rooms and no one visiting my home has ever mentioned it.  Every room has an entrance.  I wouldn't call the way to get into a room as a separate room. Other than that, I would say a got a great deal overall.



"
Recommended by55%of homeowners
Avatar for Remodel USA
Remodel USA
3.6(
203
)
Major Home Repairs (General Contractor)

Serving Accoville, WV and surrounding areas

In business since 1987

Free estimates

Credit card accepted

"The salesperson was very knowledgeable about products, He allowed me to make my own choices. Explanations of costs, materials and how long the job would take were made very clear. The install and clean up was impressive. Overall, I am very pleased with this outcome"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+67

Recommended by74%of homeowners
Showing 1-10 of 30
Subcontractors FAQs, answered by experts

Villa exterior features often include large windows, arched doorways, patios, terraces, greenery, and gardens. Common exterior colors for villas are whites and off-whites, soft browns, and clay tones. 

Ensures adherence to local building codes and customized designs to fit personal needs.

Costs depend on project complexity, materials, labor, permits, and required revisions.

You can draw your own house plans using three-dimensional modeling software, but in most cases, you’ll need an architect to draw up the final plans. Architects understand local building regulations and requirements, so their plans will be necessary for getting permits approved, and they’ll also ensure your home is structurally sound. DIY house plans can be a good place to start to help visualize your project, but you should always defer to a professional before trying to proceed with the project.

Designing a building takes 2-6 months, depending on project size, required permits, and revisions.

The Accoville, WV homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.