Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in Kewaunee, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Kewaunee, WI?

Select your specific project to find the pro for you.

Find Ceramic tile pros in Kewaunee

Avatar for Appenfeldt Woodworking Tile and Flooring
Appenfeldt Woodworking Tile and Flooring
5.0(
5
)

Serving Kewaunee, WI and surrounding areas

Approved

In business since 2024

Free estimates

Emergency services offered

"The experience that we had with Appenfeldt Flooring was excellent from the start , Nick called me set up an appointment for the next day he very professional and explained every little detail from the measurements to picking out flooring, and the install . We are very very happy with our new floor and it’s nothing short of excellent workmanship. I highly recommend Appenfeldt for all your floors ."
Flooring
Crown molding
Door
Final photo
Finish product

+26

Avatar for KT Tile
KT Tile
3.3(
3
)

Serving Kewaunee, WI and surrounding areas

Approved

In business since 2011

Free estimates

Credit card accepted

It can be a daunting task looking for not only the right contractor for your job, but also the right contractor for you. We completely understand what you are going through. We know every customer has different desires, different needs, and different schedules. We are not only here to turn your ideas into reality, but to make it a memorable experience every step of the way. Call us right now, no matter where you are in the planning process.

Response time1 day
Recommended by100%of homeowners
Avatar for Gator's Custom Tile, LLC
Gator's Custom Tile, LLC
5.0(
1
)

Serving Kewaunee, WI and surrounding areas

In business since 2021

Free estimates

Emergency services offered

Ceramic\nPorcelain\nNatural Stone\nLFT (Large Format Tile)\nSchulter shower systems\nWedi Shower systems\nProvaboard shower systems\nLVT and LVP (luxury vinyl plank luxury vinyl plank)\n\nbacksplash\nshower\naccent wall\nfloor tile\nclick flooring (LVT//LVP)\npatios\nfireplaces\nstone veneer\nbrick veneer\npool water line tile\nspa tile\nkitchenette\nresidential // commercial

Hexagon Gone
Not your typical Run of the Mill project
Glass Subway with a View
Farmhouse edition
Hexagon Gone

+67

Recommended by100%of homeowners
Showing 1-10 of 31
Ceramic Tile questions, answered by experts

Most professional shower tile installations take between six and eight hours, depending on the size and complexity. Most projects get completed in a single workday. DIY-ing the project takes around three to four days or roughly 16 hours. However, this will vary based on the skill level of the person completing the work.

Tile shouldn’t be set tight against the tub. Bathtubs can expand when filled, and they can shift slightly with the weight of occupants. For this reason, it’s important to leave a slight gap between the bathtub and the first row of tile. Aim for a narrow gap of approximately 1/16 of an inch, filled with caulk, to allow for this expansion and movement while still allowing for tile shower waterproofing.

Professional installation ensures a uniform, durable surface, and proper sealing, and guarantees workmanship quality, preventing future issues linked to water damage or instability.

When tiling over concrete, you should install an anti-fracture membrane after the concrete has been prepared. The anti-fracture membrane acts as a moisture barrier and should be installed to protect the tiles from moisture which helps maintain their integrity. Often, Ditra, a brand name, is used interchangeably with moisture barrier.

The difference between floor and wall tiles is that floor tiles generally have higher strength and porosity ratings than wall tiles. Wall tiles are typically weaker and more likely to crack or become damaged under sustained pressure like high foot traffic. 

For this reason, avoid using wall tiles on floors and vice versa.

The Kewaunee, WI homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.