Top-rated solar panel pros.

Get matched with top solar panel pros in Bloomer, WI

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Bloomer, WI?

Select your specific project to find the pro for you.

Find Solar panel pros in Bloomer

Avatar for R&J Solar LLC
R&J Solar LLC
5.0(
2
)

Serving Bloomer, WI and surrounding areas

In business since 2022

Free estimates

Credit card accepted

We provide residential and commercial solar power options, and provide support services for industry partner companies. We offer no cost consultations and $0 down financing. Please contact our office for a consultation at (931)922-8258.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+3

Recommended by100%of homeowners
Solar Chippewa Valley
5.0(
1
)

Serving Bloomer, WI and surrounding areas

In business since 1999

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality and customer service, that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship, and complete customer satisfaction, from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate, with every customer in a professional manner. Our reputation is based on service, safety and quality, regardless of the job. Call us today!

Response time1 day
Response rate100%
Recommended by100%of homeowners
Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)

Serving Bloomer, WI and surrounding areas

In business since 1971

Credit card accepted

"The last was a rental company that we have and we used them for an air conditioning and heating system. It was Bototach Mechanical. It’s been a good program for us. They’re very responsive. I don’t know what the thought process was. My husband said, well let’s try these guys and so we did. We have an older home and it’s proved to be a very good deal. The quality has been pretty good, so I would give them an A for the quality. I will give you one helpful hint though. If the company decides they want to replace an appliance, you need to call them and negotiate with them because you can upgrade, but you need to talk to them in person not just do it over the internet."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Solar Panels questions, answered by experts

You shouldn’t hook up a solar panel directly to a battery. That can damage the solar battery and your appliances over time. Instead, install a charge controller between your solar panel and solar battery. Charge controllers regulate voltage, prevent overcharging, and minimize the amount of electrical current to protect your battery from voltage spikes.

Solar panels can pay for themselves in five to 15 years, depending on the cost of your system, how much energy it generates, whether you qualify for incentives or power buybacks, and the price of energy in your area. Solar panels pay for themselves over time as they lower electricity bills, so it will take time to recoup your initial investment. However, the longer you have your system, the more money you can save and earn.

On average, a typical fridge uses 115 kWh per month. With eight hours of sunlight per day, a 100-watt solar panel can produce 30 kWh per month. This means you’ll need at least four dedicated panels to power the refrigerator with solar energy. Consult with a solar power specialist to get a more accurate estimate.

Solar water heating systems are not one-size-fits-all. You'll likely work with a team of experts to get the job done—including solar panel installers, plumbers, and water heater installers. A specialist will help you decide if a passive or active system is best for your local weather, home layout, roof stability, and your budget.

The time it takes to install solar panels depends on the number of panels and the size of your home, but installation takes between two and three days of work. While most contractors can install the panels over the course of a couple of days, switching to solar energy can take two to three months in total. This includes the time it takes to design the system, procure the parts, obtain the permits, install the panels, connect to the main power grid, and get an inspection.

The Bloomer, WI homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.