Top-rated wallpaper removers.

Get matched with top wallpaper removers in Grapeview, WA

Enter your zip and get matched with up to 5 pros

Need a pro for your wallpaper removal project in Grapeview, WA?

Select your specific project to find the pro for you.

Find Wallpaper removers in Grapeview

Sound Wallcoverings
3.7(
14
)
Wallcovering or Wallpaper - Removal

Serving Grapeview, WA and surrounding areas

Approved

In business since 1984

Free estimates

Credit card accepted

"Everything was handled well. My wallpaper was damaged by time and now I can't see where the damage existed. Everything went fine from moving a large buffet away from the wall, healing the paper with new glue (it looks great) and returning the buffet back to it's place. I would recommend this company to anyone asking."
Response time7 hrs
11 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Honeycomb Construction
Honeycomb Construction
4.8(
40
)
Wallcovering or Wallpaper - Removal

Serving Grapeview, WA and surrounding areas

In business since 2019

Free estimates

"WE HAVE HIRED SD EXPRESS FOR 2 JOBS IN THE LAST MONTH. THIS TIME EUGENE AND IAN REMOVED THE POPCORN CEILING IN ALL BUT THE BEDROOMS. WHAT ALOT OF WORK AND MESS. LIKE BEFORE THEY DID A GREAT JOB. WE ARE VERY HAPPY WITH THE RESULTS AND GLAD WE FINALLY HAD IT DONE BY SDEXPRESS. GREAT PEOPLE AND VERY SKILLED IN THE WORK THEY DO."
exterior
exterior
exterior
exterior
exterior

+32

Response time1 day
Response rate86%
Recommended by97%of homeowners
Palm Construction and Remodeling Inc.
4.2(
88
)
Wallcovering or Wallpaper - Removal

Serving Grapeview, WA and surrounding areas

In business since 2020

Free estimates

Offers commercial services

"This job was to renovate my home in preparation to sell it in early March. It consisted of a kitchen and 3 bathroom upgrade, flooring and lighting fixture replacement, painting and removal of 3 popcorn ceilings. Beginning the second week of January, the entire job was completed within 6 weeks. When first hired, the principal of Palm Construction carefully tuned in to my specific needs and targeted timeframe, offering succinct suggestions respects colors, style and quality of products used. Specialists in each trade worked cohesively with each other, as well as alongside other contractors that I had personally hired separately for windows and pool replaster. Although I had intended to live in the property during the renovation, I quickly realized that my occupancy was impeding progress, so I made the decision to vacate the premises. This was especially important during the removal of popcorn ceilings which contained asbestos. The work moved seamlessly from the removal of kitchen counters, sink, cabinet doors, appliances and flooring to the demolition of 3 bathrooms. Timely mutual decisions were made about fixtures, mirrors, flooring, sinks, vanities, paint and hardware, allowing the job to progress steadily to reach very precise goals. Along the way, it was determined that the air ducts needed replacing and AC would be a welcome addition to the total job. These issues were discussed and explained clearly and quoted at a reasonable cost - so I decided to add the change orders. Although I had never been involved with a home renovation in the past, I was very impressed with the patience and care taken to communicate with me throughout the entire job. I was a demanding customer with an expectation of perfectionism and Palm Construction was up for the challenge. Beyond the scope of the original job, Palm went above and beyond with finishing touches and little extras here and there. They've come back to help me even after completion of the job, when I needed some additional retrofits for my appliance installation, which was not even part of the original job. I know that I can count on Palm Construction to be responsive and willing for anything that may come up in the future. I learned that they are a GC that you can totally trust and rely on. In summary, I am in awe of the completed work. My friends and neighbors are astonished with the transformation of my home. The end product is flawless and most impressive. My realtor has already offered Palm Construction opportunities for other jobs. My neighbors have asked for their contact information to get quotes. I highly recommend Palm Construction for your renovation work, whether it is a large or small job. During the 6 weeks of this job, I got to know the principal, Guy Yaakov, and his team. Despite the complexities of the job and the incidental issues that came up, the personal follow-through and attention paid to all questions and requests were taken care of expeditiously and professionally. I couldn't be happier, plus, I made a friend. Thanks, Guy!!!!"
Response time2 days
Recommended by90%of homeowners
Ybarra Professional Builders
4.3(
80
)
Wallcovering or Wallpaper - Removal

Serving Grapeview, WA and surrounding areas

In business since 1977

Free estimates

Credit card accepted

With over 40 years of experience, Ybarra Professional Builders, is a leader in the industry. Specializing in additions and remodels, we guarantee our work, and stand by our promise, to provide homeowners with quality work in Riverside county. Call today to book an appointment!

Response time4 days
Recommended by83%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)
Wallcovering or Wallpaper - Removal

Serving Grapeview, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
Avatar for Express Painting Service
Express Painting Service
5.0(
2
)
Wallcovering or Wallpaper - Removal

Serving Grapeview, WA and surrounding areas

In business since 2000

Free estimates

Express Painting Service offers the best off Service to all your costumers. Offering all kinds of work from painting interior & exterior, drywall, textures install door retaining walls, general clean up, paving, trimming, pruning, fencing, irrigation system, and building. We have more than 10 year experience. Call us to get your free estimate. Thanks you.

Express Painting Service
Drywall Painting interior exterior texture
Additional Photos
Additional Photos
Additional Photos

+26

Recommended by100%of homeowners
Avatar for Peretepaintingllc
Peretepaintingllc
5.0(
2
)
Wallcovering or Wallpaper - Removal

Serving Grapeview, WA and surrounding areas

In business since 2012

Free estimates

Peretpaintingllc is your painting professionals specializing in Interior and Exterior Painting. We are fully licensed and insured and family owned and operated. We pride ourselves on our attention to detail, providing honest customer service, and very competitive pricing. This has allowed us to develop a loyal customer following that were excited to add you to. Contact us for a free estimate today!

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by100%of homeowners
All About Painting
5.0(
1
)
Wallcovering or Wallpaper - Removal

Serving Grapeview, WA and surrounding areas

In business since 2010

Free estimates

Emergency services offered

We��re a locally owned and operated company. We value honesty and integrity, and stand behind our work, that's why we are the only painting contractor in the area to offer you a 5 year workmanship warranty. We specialize in both interior and exterior residential and commercial painting projects, We have 100's of references and we offer FREE Estimates and also offer senior and military discounts we also will match and beat our competitors by 10%, We are licensed, bonded and insured, We don't get paid until you are completely satisfied We pride ourselves on the quality of our work, as well as our commitment to outstanding results. We look forward to building long-term relationships with our clients, and guarantee your satisfaction!

Recommended by100%of homeowners
Showing 1-10 of 14
Wallpaper Removal questions, answered by experts

You’ll need to wash the walls to remove wallpaper adhesive residue after removal as part of the prep process for painting or rehanging wallpaper. Old adhesive can cause texture issues and prevent paint or wallpaper from adhering properly to the wall’s surface.

It can take a professional anywhere between several hours and a full day to remove wallpaper in one room. How long wallpaper removal takes depends on the type of adhesive, the wallpaper’s age, the condition of the walls, and more.

The average cost to remove wood paneling is $2,800, but total costs may be higher or lower depending on the size of the room, your location, and the amount of prep work required. Once the paneling is gone, you may have additional costs depending on the condition of the wall beneath.

Wallpaper in bathrooms can last anywhere from one to 10 years, depending on what type was used, how well it was installed, and the measures in place to reduce moisture and humidity levels. Opting for a more durable variety and taking all the necessary protective measures will get you closer to that longer lifespan.

Yes, many types of peel-and-stick wallpaper can be used in bathrooms, especially those made of vinyl or polyester. However, its success depends heavily on the level of moisture and ventilation. In bathrooms with good ventilation, such as those with fans, it can be a durable option. Peel-and-stick wallpaper may not adhere as well as traditional wallpaper in very humid conditions. For bathrooms that see a lot of moisture, like a kids' bathroom or a full bath with a steamy shower and poor ventilation, even high-quality peel-and-stick wallpaper is likely to peel over time.

The Grapeview, WA homeowners’ guide to wallpaper removal services

From average costs to expert advice, get all the answers you need to get your job done.