Get matched with top subcontractors in Ferrisburgh, VT

Ferrisburgh homeowners rate subcontractors in our network

4.6

(149 reviews)

Top-rated subcontractors.

Need a pro for your subcontracting project in Ferrisburgh, VT?

Select your specific project to find the pro for you.

Find Subcontractors in Ferrisburgh

Bowen Ridge Construction
5.0(
7
)

Serving Ferrisburgh, VT and surrounding areas

Approved

In business since 2016

Free estimates

Warranties offered

"This project was a pleasure. Joe was great to work with at all stages of the project. He did a great job communicating about his schedule and always showed up when he said he would. The project met all of our expectations. We would definitely hire again if a new project comes up."
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project

+106

Response time1 day
3 neighbors recently requested a quote
Recommended by100%of homeowners
TJL Construction
4.6(
36
)

Serving Ferrisburgh, VT and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"could not be happier with the quality of their work. They assembled a kit that, after I bought it, I read was notoriously difficult. Any problems in the parts, they resolved beautifully. Could not be happier with their work and would hire them again without hesitation."
Garage build
Remodel
Garage build
Remodel
Garage build

+130

Response time2 days
10 neighbors recently requested a quote
Recommended by78%of homeowners
Avatar for SEJAY CONSTRUCTION LLC
SEJAY CONSTRUCTION LLC
4.8(
24
)

Serving Ferrisburgh, VT and surrounding areas

Free estimates

"Rick installed a new metal roof on a large barn. He went over and beyond in not only installing the roof, but also securing old supports that have saved the barn. Rick and his crew are professional and did the job in a very clean and timely manner."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+374

Recommended by100%of homeowners
Avatar for Colonial Restorations
Colonial Restorations
4.5(
28
)

Serving Ferrisburgh, VT and surrounding areas

In business since 1981

"Barn Rescue – My barn was hit by a vehicle, which broke a large post and pushed section of siding out from under the roofline, plus major damage at ground level. Brad shored it up for the winter with an array of jacks and an enormous chain to ensure the thing wouldn’t fall down till they could return in the spring. Come spring, they fully replaced the damaged section’s support members and facade, and added bracing to the attic, rendering it stronger than before. Foundation support: The sagging beams and jerry-rigged support columns in the dirt basement of our 18th century house were inadequate. They dug and poured a dozen footings and lally columns, supporting a line of new 6x6 and 9x9 beams that provide solid support to the house above. They showed up promptly every day, worked fast, and left the site clean and finished. Both Brad and Chad have a deep knowledge about old houses and the techniques that were used, and I felt my historic register property was in good hands."
Post Replacement
Before
During
Barn Roof Replacement
Before

+6

Recommended by87%of homeowners
...
Showing 1-10 of 55
Subcontractors questions, answered by experts

Building permits serve a few purposes, the most important of which is to keep you and the people around you safe by ensuring your contractor does work safely and to code. Permits also help your municipality tax your property appropriately, as taxes are based on land improvements and the upgrades you make to your home. Finally, permits ensure your project won’t have a negative impact on the environment or your neighbors.

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Costs depend on material, size, design complexity, and additional features like lighting or seating.

Costs vary depending on project complexity and scope. Architects generally charge a percentage of the total budget or an hourly rate for their services.

The costs depend on the type of wood, labor, roofing material, permits, and whether additional storage or enclosed walls are included.

The Ferrisburgh, VT homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.