Top-rated rototilling pros.

Get matched with top rototilling pros in Cavendish, VT

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Cavendish, VT?

Select your specific project to find the pro for you.

Find Rototilling pros in Cavendish

CRV Construction

3.00(
2
)

CRV Construction

3.00(
2
)
30 years of experience

18 PLUS YRS IN BUSINESS. START TO FINISH HOME'S 100% SATISFACTION A+ RATING WITH BETTER BUSINESS BUREAU BBB.ORG WWW.CRV-CONSTRUCTION.COM +

18 PLUS YRS IN BUSINESS. START TO FINISH HOME'S 100% SATISFACTION A+ RATING WITH BETTER BUSINESS BUREAU BBB.ORG WWW.CRV-CONSTRUCTION.COM +


Bald Mountain Home and Farm Care, LLC

No reviews yet

Bald Mountain Home and Farm Care, LLC

No reviews yet
13 years of experience

We are a small family owned business with a combination of over 30 years in the services we offer. We are mainly a husband and wife team, we hire temporary employees on a as needed basis. We offer top quality work that we guarantee and will stand behind.

We are a small family owned business with a combination of over 30 years in the services we offer. We are mainly a husband and wife team, we hire temporary employees on a as needed basis. We offer top quality work that we guarantee and will stand behind.


Mountain Man Services

No reviews yet

Mountain Man Services

No reviews yet
14 years of experience

We are a family run business based in East Thetford Vermont. We offer the highest quality handyman services. No job is too big or too small. We have doubled in size in the last year and continue to grow and expand our services.

We are a family run business based in East Thetford Vermont. We offer the highest quality handyman services. No job is too big or too small. We have doubled in size in the last year and continue to grow and expand our services.

Rototilling questions, answered by experts

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

Not typically. A paver patio drainage problem generally requires a landscaping fix that can include a drainage pipe or dry well capable of handling the amount of runoff in your yard.

Yes, rain can affect the results of a perc test because it will partially saturate the soil and slow down the rate of drainage. Ideally, you should do a perc test during the driest time of the year and try to schedule it after a stretch of days where no precipitation occurs. This will give you the best chance of passing.

For minor unevenness, you don't necessarily need to remove grass before leveling. You can apply a topdressing mixture to fill in low areas and even out the surface. However, for more significant unevenness or deep depressions, it might be necessary to temporarily remove the grass to ensure proper leveling and soil compaction. After filling and leveling, you can replace the grass or consider reseeding the area.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"