Top-rated rototilling pros.

Get matched with top rototilling pros in Moab, UT

Enter your zip and get matched with up to 5 pros

Need a pro for your rototilling project in Moab, UT?

Select your specific project to find the pro for you.

Find Rototilling pros in Moab

Incredible Tone

No reviews yet

Incredible Tone

No reviews yet
16 years of experience

Do you want prompt, honest, affordable and professional service for all of your to do's you don't want to do? Well you have found the right place! We do little jobs from fixing a leaking faucet, installing a new toilet to over hauling an abandoned or foreclosed home so that you can focus on what you would like to do on your to do list. We cover the entire state of Utah and will travel. Give us a call and save.

Do you want prompt, honest, affordable and professional service for all of your to do's you don't want to do? Well you have found the right place! We do little jobs from fixing a leaking faucet, installing a new toilet to over hauling an abandoned or foreclosed home so that you can focus on what you would like to do on your to do list. We cover the entire state of Utah and will travel. Give us a call and save.

Rototilling questions, answered by experts

Yes, you can rent a rototiller for around $60 per day and do the work yourself, but it’s not recommended. Tilling is more of an art than a science, as tilling too deep can be detrimental to your soil structure and the organic matter that is beneficial to plants and shrubs, and tilling too shallow won’t properly introduce fertilizer or break up the soil for rooting plants. Additionally, tillers are powerful machines with sharp blades to cut through small roots and soil, so they are inherently dangerous to use. It’s usually worth it to hire a professional rototiller.

For minor unevenness, you don't necessarily need to remove grass before leveling. You can apply a topdressing mixture to fill in low areas and even out the surface. However, for more significant unevenness or deep depressions, it might be necessary to temporarily remove the grass to ensure proper leveling and soil compaction. After filling and leveling, you can replace the grass or consider reseeding the area.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Typically 1-3 days, depending on property size and terrain condition.

Yes, most services include grading for proper drainage. Confirm with your contractor.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"