Top-rated basement remodelers.

Best basement remodelers near Spicewood, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Spicewood, TX?

Select your specific project to find the pro for you.

TRUSTED BY SPICEWOOD, TX HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon22
    Verified basement remodels reviews

Top-Rated Basement remodelers in Spicewood - Updated Nov 2026

Avatar for Ace Remodeling TX
Ace Remodeling TX
4.8(
149
)
Basement - Remodel

Serving Spicewood, TX and surrounding areas

Approved

In business since 2013

Free estimates

Credit card accepted

"Carlos from Ace Remodeling TX did our full house remodel, and the results were awesome. His ability in the remodeling process was great in making informed decisions. The teams commitment was evident in every aspect of the project. Carlos ensured the highest quality of the remodelling process. Our home now reflects the perfect blend of functionality and style. Thanks to Carlos and the entire Ace Remodeling TX team."
Kitchen Remodel Cedar Park
Austin Bathroom Remodel
Bathroom Expansion
Remodel to Open Concept Kitchen
Kitchen Remodel

+385

Response time10 hrs
Response rate95%
48 neighbors recently requested a quote
Avatar for Unique Remodeling and Floor Designs
Unique Remodeling and Floor Designs
5.0(
7
)
Basement - Remodel

Serving Spicewood, TX and surrounding areas

Approved

In business since 1995

Free estimates

Emergency services offered

"We have worked with Unique Remodeling and Floor Designs several times over the past few years. They've redone bathrooms, our fireplace, flooring, and even our ceilings. Every time we have a home project coming up, we know exactly who to call. This team is professional, transparent, thorough, and, best of all, wonderful people."
3 neighbors recently requested a quote
Avatar for RJ service
RJ service
5.0(
1
)
Basement - Remodel

Serving Spicewood, TX and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"I had them come to fix my carpets that were stretching away from the walls. I would say its was a wonderful job done!!! I would highly recommend them for any service they provide. The positive attitudes and kind service with a smile was much appreciated and made a world of difference with having people in my place. Thank you guys!!!"
North Austin
North Austin
North Austin
North Austin
North Austin

+4

First call services
New to Angi
Basement - Remodel

Serving Spicewood, TX and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

I have been in the construction business for 20+ years. I have experience in all remodels and additions from framing,Sheetrock,painting shower builds as well as tile tub surround, walk-in showers ,backsplashes and flooring. \nShower doors installation. Interior exterior trim,millwork, cabinets,doors.\nWe will take the time and make sure you are happy and get exactly what you envisioned. Punctuality and communication is very important to us and will always work with professiolism and respect. \n

4 neighbors recently requested a quote
Avatar for CW Custom Builders
CW Custom Builders
New to Angi
Basement - Remodel

Serving Spicewood, TX and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

CW Custom Builders is a high-quality residential and commercial construction company serving Central Texas. We handle all phases of construction—from new builds to remodeling and additions—while priding ourselves on a foundation of honesty and integrity. Call today to get your project underway 830-391-9897.

...
Showing 1-10 of 169
Basement Remodel FAQs, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Since DIYing a basement remodel isn't typically advised, there are some ways that you can still save money on this project without putting yourself in danger. Some ways to save money on a basement remodel include:

  • Painting walls yourself versus including in the cost of the remodel 

  • Installing light fixtures yourself

  • Choosing prefabricated fixtures, like cabinets, over custom ones

  • Choosing a budget-friendly flooring option, like laminate or vinyl flooring, and add rugs where necessary

Yes, it is possible to turn a regular basement into a walkout basement. Doing so involves excavating the land around at least one side of your basement foundation, installing retaining walls to create a permanent below-grade area outside your home, and then cutting into the foundation to install an exterior door that leads out to the new space. This is an expensive and time-consuming project, but it can add a lot of value and utility to your home.

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Spicewood, TX homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.