Top-rated excavation pros.

Get matched with top excavation pros in Hubbard, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Hubbard, TX?

Select your specific project to find the pro for you.

Find Excavation pros in Hubbard

Avatar for Dumpster Dog
Dumpster Dog
5.0(
10
)

Serving Hubbard, TX and surrounding areas

Approved

In business since 2023

Free estimates

Credit card accepted

"This is hands-down the best company Iâ  ve ever seen theyâ  re quick to respond. They do what they say theyâ  re going to do for the best price."
Junk Removal
Junk Removal
Junk Removal
Junk Removal
Junk Removal

+16

Response time10 hrs
42 neighbors recently requested a quote
Recommended by77%of homeowners
Horst Construction
4.8(
6
)

Serving Hubbard, TX and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"EXCELLENT service! I could not recommend these guys more. I'll be using them moving forward for all of my farm and road work. Trust is a BIG ISSUE with me and they proved to be totally trustworthy and an expert in this field. Mr. Horst personally inspected our place, made the perfect recommendations on how to fix our issues and did a fantastic job."
Road entrance
Road
Road 2
House Pad on Lot 2
3 House pads

+21

Response time1 day
Response rate90%
Recommended by83%of homeowners
Avatar for 888 BUILDERS, INC.
888 BUILDERS, INC.
4.0(
20
)

Serving Hubbard, TX and surrounding areas

Approved

In business since 1990

Free estimates

Small jobs welcome

"I am going to be as honest as possible to help out the next person in their decision to hire him. First and foremost he is a great guy and friendly, he knows what he is doing and his workmanship is top notch. I initially hired him for a patio / porch and then a 3car garage. When he started it was going well and after I paid him a little more so he could get ahead, he would run out of material and would just leave without saying anything. His work was impressive but I felt he became complacent and started cutting corners because he ran out of money to buy materials. As an example: Not planning ahead, he left a portion of my roof exposed and the rain went into my home causing considerable sheet rock and insulation damage. He could have covered it to prevent some of the damage but his response was â I canâ t control the weatherâ . That was disappointing as I had to cover that bill myself. On the 3 car garage, I ran into the same problem. He started slowing down I was a little disappointed with the timelines. He would show up and work a few hours then leave. Despite me asking for a blueprint or plan. He failed to provide one. On several occasions he ran out of material and the work was delayed. The workers he had would come to me and say they would have to leave because there was no more material. I did notice that when you asked him questions he would get a little defensive. Unfortunately some of his hard work was tarnished by his lack of planning despite being paid in advance. Half of my structure remained exposed due to lack of planning on his part. Towards the end of the project he was piecing boards together and using left over scraps as patch up work. I did question him on a few things like hauling of the leftover material but he referred to the contract and said it was not in the contract. However, he was willing to charge me more money to get it removed. In order to end in good terms, I just wanted him to finish what he started and paid him to avoid further disappointment. I still have left over material to haul away, a few areas to patch, tape and seal. I would recommend him because of the skill he has however, I may or may not hire him again. I would let the next person know to MAKE SURE you read the contract very carefully, ask questions and request plans with a timeline or you will have to hire other people to finish his work. I have plenty of pictures to share if interested."
El Barco
Response time1 day
31 neighbors recently requested a quote
Recommended by57%of homeowners
Avatar for Henry Junk Removal Services
Henry Junk Removal Services
5.0(
2
)

Serving Hubbard, TX and surrounding areas

Approved

"Just a lovely man. Works with his wife and mom. Came over, cleared out problem shed, swept it, and did it all in about an hour and 1/2. We were really impressed. We plan to use him again as our cleanup continues…"
25 neighbors recently requested a quote
...
Showing 1-10 of 112
Excavating questions, answered by experts

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Sewer lines can be buried anywhere from 18 inches to 8 feet deep, with a common average depth between 18 and 30 inches. The exact depth depends on local factors like climate and soil type. In colder regions, pipes must be buried deeper (below the frost line) to prevent freezing, sometimes as deep as 8 feet. The digging depth can also impact the cost of sewer line replacement. To find the specific depth for your property, you can check the building plans for your system, which should be on file with your city or local sanitation department since permits are required for installation.

Underground downspouts refer to the sections of downspout extensions that lead away from your home and gutter system. While they cost more than traditional extensions, they can provide several benefits, such as less frequent damage and no need to move them for lawn care tasks. Whether they're worth it or not depends on your budget at installation time and how much convenience they'll add to your situation.

Yes, trenchers can go through gravel. Gravel is made up of smaller, softer rocks that certain trenchers are able to cut through. Just be sure to use a rock wheel trencher or chain trencher, both of which are made to cut through rocky landscapes and gravel pathways without dulling the teeth or chain.

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

The Hubbard, TX homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.