Top-rated generator install pros.

Get matched with top generator install pros in Gardendale, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your generator install project in Gardendale, TX?

Select your specific project to find the pro for you.

Find Generator install pros in Gardendale

Avatar for ABC Electric
ABC Electric
New to Angi
Portable Generator - InstallPortable Generator - Repair

Serving Gardendale, TX and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

ABC Electric is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and responsibility in all of our jobs. We are a locally owned and operated business with more than 5 years of experience serving Midland, TX and surrounding areas. There is no job too big, or too small for our team. Call today and let us put our experience to work for you!

My latest project
Avatar for Unity Electric, LLC
Unity Electric, LLC
4.0(
43
)
Fixed Generator - InstallGenerator - Install - For Business

Serving Gardendale, TX and surrounding areas

In business since 1982

Free estimates

Emergency services offered

"Date: March, 2016. Estimate: $300-$500. Actual Cost: $665. Work performed: Installed 2 light fixtures in garage, removed, purchased, installed the outside door fixture, completely checked the circuit breaker box for dishwasher issue & changed out circuit breakers to help narrow down the dishwasher issue. Heck, they even checked my battery operated drill to help me figure out if the problem was the charger or batter(s). Prepared for the $500 charge, but when the final bill came in, I paid it - gladly. Why? Because this company did not take advantage of me. I may have been behind the actual final cost for the hourly pay/benefit scale for a electrician and helper; but, I was pretty close when I finally figured in one electrician & one helper. The guys were here for 3/4 of the work day (minus lunch break) and they were thoughtful, careful, and really addressed any and all of my electrical concerns. And, to boot, both handled my big dogs wonderfully. I can honestly say, after building one house in Midland County & remodeling my current home in the city, Unity Electric is probably the only contractor or subcontractor I would not have taken to court - and I did win. I wish there were more reliable and honest contracts for home repair as this company."
Recommended by96%of homeowners
Showing 1-10 of 39
Generator Install questions, answered by experts

Generally, you’ll want to keep between 60 and 70 feet between the generator and the transfer switch. There are a few reasons for this, including:

  • The distance reduces the noise coming from the generator into your home.

  • It increases efficiency because you won’t have a voltage drop from this short of a distance.

  • Prevents carbon monoxide poisoning: keep at least 15 feet between your generator and an open window. 

With proper maintenance, a whole-house generator can last between 20 and 40 years. The specific lifespan depends on how often and for how long the generator is used, and some models may have their life expectancy rated in hours of operation. To maximize its lifespan, expect to spend around $150 to $300 per year for annual maintenance checks from a qualified technician. During these checks, a technician will inspect the engine filter, starting mechanism, fuel, lubrication, and coolant levels. Consulting your installer and choosing a low-impact fuel like natural gas or diesel can also help ensure your generator lasts as long as possible.

The amount of time a standby generator can run continuously is around 3,000 hours on average. However, standby generators can generally run indefinitely as long as they have a continuous fuel supply. Generators hooked up to a home’s natural gas supply are the best option for extended usage, as these won’t rely on a finite fuel supply based on how much you have in storage. Generators running on liquid propane or diesel won’t last as long, as these require fuel storage and regular refueling to stay running.

Setting up utilities on a vacant property usually takes at least a few months, or between 6 weeks to 16 weeks. This process requires working with the local planning and zoning department, hiring a building contractor or engineer to design the utility layout, securing permits, laying the lines, and connecting the utilities.

Whole-house generators can run continuously for extended periods, even for weeks at a time (around 400 to 500 hours), as long as they have a sufficient fuel supply. However, this type of extensive use will increase wear and tear and can shorten the generator's overall lifespan. During long periods of operation, it's important to check and refill the engine oil as needed, potentially as frequently as daily depending on the model. If your generator uses a fuel tank, ensure it is kept full to prevent unexpected shutdowns.

The Gardendale, TX homeowners’ guide to generator installs

From average costs to expert advice, get all the answers you need to get your job done.