Top-rated pole barn builders.

Get matched with top pole barn builders in Double Oak, TX

Enter your zip and get matched with up to 5 pros

Need a pro for your pole barn building project in Double Oak, TX?

Select your specific project to find the pro for you.

TRUSTED BY DOUBLE OAK, TX HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon171
    Verified pole barn building services reviews

Find Pole barn builders in Double Oak

Avatar for MCO Remodeling
MCO Remodeling
5.0(
13
)
Shed, Barn or Playhouse - Build

Serving Double Oak, TX and surrounding areas

Approved

In business since 2023

Free estimates

Warranties offered

"This company make my bathrooms remodeling and they do a Exellent and nice job I really love the results for sure I am calling them back for futures works,THANKS MCO"
Response time7 hrs
Response rate100%
3 neighbors recently requested a quote
Avatar for Frank's Handyman LLC
Frank's Handyman LLC
4.1(
35
)
Shed, Barn or Playhouse - Repair

Serving Double Oak, TX and surrounding areas

Approved

In business since 2005

Free estimates

Emergency services offered

"Way over priced. 500.00 to install a door that I am buying, and 5000.00 to replace 9 pieces of siding and paint 3 sides of a 26 X 48 house. I already had an estimate and received 1 more today and I am getting both done for just over half of that."
Additional Photos
Additional Photos
Response time2 days
Response rate100%
1 neighbors recently requested a quote
Avatar for Shaw Construction & Remodeling
Shaw Construction & Remodeling
New to Angi
Shed, Barn or Playhouse - Repair

Serving Double Oak, TX and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

I’m Brandon Shaw, owner of SHAW Construction & Remodeling, serving homeowners across North Texas. I’ve spent over a decade in construction, starting in heavy equipment and moving into hands-on residential remodeling, so I understand both the big picture and the small details that make a job last. My company focuses on quality work—whether it’s painting, flooring, drywall, or full interior upgrades—and I treat every home like it’s my own. I believe in doing things right the first time, communicating clearly, and standing behind my work long after the job is done.

...
Showing 1-10 of 483
Pole Barn Builders questions, answered by experts

Complex plumbing is tricky and expensive in an off-the-ground dwelling like this. By considering options like composting toilets, rainwater collection, and gray-water sinks, you save money and help the environment. 

Generally speaking, building a swing set is cheaper than buying a prefabricated one, but this assumes you have all the tools and knowledge to complete the project. The average cost to build a swing set is $514, but you should also factor in the time and effort it will require—if you don’t want to give up your weekend, it’s worth considering buying instead of building.

Tiny houses, often called tiny homes, need between 100 to 400 square feet, with the most common size being between 200 and 300 square feet. Tiny houses more than 400 square feet venture into apartment-size dwellings and may be considered more of a traditional house than a tiny home. The number of occupants, desired lifestyle, and furniture will all be major factors that determine the desired tiny house size.

Any type of construction that damages a tree’s roots via soil compaction can be dangerous, and is one of the primary causes of mature tree death in residential areas. Simply putting lots of weight on the ground around the tree, like construction supplies, trailers, and equipment, can kill roots near the surface. Of course, installing new foundations, patios, or utility lines can cut through nearby tree roots. Accidentally striking a tree with equipment or supplies is rarely a problem, but can cause damage of its own, too.

The construction stage is almost always the longest part of building a house. Within this stage, framing often takes the most time, lasting anywhere from one week to a couple of months, depending on the home's size, the crew, and the time of year. Other parts of the construction phase include pouring the foundation and installing doors, windows, a roof, siding, drywall, and flooring. The planning and design phase can also be very time-consuming, sometimes taking months or even years, especially for a custom home. The final finishing process, which includes painting and installing trim, is typically shorter than the construction or planning stages.

The Double Oak, TX homeowners’ guide to pole barn building services

From average costs to expert advice, get all the answers you need to get your job done.

  • Farm blue barn shed and gravel driveway.

    If you’ve ever wondered what precisely a pole barn is, you’re about to find out. Not many know the advantages and disadvantages to the cost, construction style, and flexibility of building one on your own or hiring a contractor for the job.

  • framework of building a farm

    Learn how to hire a barn builder with expert guidance on finding qualified pros, asking the right questions, and ensuring your barn project succeeds.