Top-rated kitchen and bathroom remodelers.

Get matched with top kitchen and bathroom remodelers in Trimble, TN

Enter your zip and get matched with up to 5 pros

Need a pro for your kitchen and bathroom remodel project in Trimble, TN?

Select your specific project to find the pro for you.

TRUSTED BY TRIMBLE, TN HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon10
    Verified kitchen and bathroom remodels reviews

Find Kitchen and bathroom remodelers in Trimble

McNeill’s Mobile Welding
New to Angi
Bathroom - RemodelKitchen - Remodel

Serving Trimble, TN and surrounding areas

Approved

In business since 2024

Warranties offered

Credit card accepted

McNeill's Welding and Construction is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests and make their concerns the basis of our business.

Kitchen remodel
Kitchen remodel
10x10 deck
8x8 deck
6 neighbors recently requested a quote
Avatar for All Wall Concepts
All Wall Concepts
4.7(
19
)
Bathroom - RemodelBathroom - Remodel - For BusinessKitchen - Remodel+3 more

Serving Trimble, TN and surrounding areas

In business since 2009

Free estimates

Emergency services offered

"He started working right after the contract was signed.  I was not expecting the work to start so soon but he started on the prep work. First he started in the hallway stripping the wallpaper and prepping the area to be painted. Next he applied blue tape to the areas to be painted in the dining room . He then helped to move small items from the Dining Room.  He covered the remaining furniture with plastic.  The next day  he scraped the popcorn from the ceiling mudded and applied the first coats of paint.  He would switch between working on the ceiling, to painting the hall, and painting the back stairway. By the end of the day the work on small hall and back stairway was complete.  The next day he finished painting the Dining Room ceiling.  He then started and finished painting the wood work and walls in the Dining Room.  He started and finished the door last.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+5

Recommended by89%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Bathroom - RemodelBathroom - Remodel - For BusinessKitchen - Remodel+3 more

Serving Trimble, TN and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Showing 1-10 of 50
Kitchen and Bathroom Remodel questions, answered by experts

Costs depend on project scope, materials, labor, and custom features like lighting or storage solutions.

A frameless shower door installation can increase your home’s resale value because of its modern aesthetics and luxurious look. Not only do frameless shower doors provide more space in the bathroom and enhanced utility and functionality, but this upgrade can promote a luxurious user experience. If you’re looking to sell your home in the near future, this could be a good upgrade for the bathroom.

Completing a full standard bathroom remodel offers the best value, with an average return on investment (ROI) of 70%. However, you don't need a full remodel to make an impact. To maximize value, focus on key components like flooring, the tub and shower, vanity, and cabinets. High-value upgrades include installing a walk-in shower, resurfacing a tub, retiling, or expanding the shower. For more budget-friendly options that still increase value, consider repainting with a light, neutral color, or updating the mirror and light fixtures. It's also crucial to address any necessary repairs, such as leaks, mold, or cracked tiles, as buyers will notice these issues. Avoid flashy upgrades like bathtub jets or steam showers, which don't add as much value.

A bathroom addition project takes five to 12 weeks from the design stage to the end of construction, but it varies with the complexity of the project and your goals. Adding a small half bath takes less time than building a luxurious, high-end primary bathroom. It could also take longer if you need to run new electrical and plumbing in the room.

Adding another bathroom isn’t the most complicated project you can undertake, but it’s in the top 5%. Anything involving plumbing and electrical work should be handed off to a pro, and adding a half bath involves both. A contractor may charge $70 to $120 an hour for labor, but chances are they can work much faster and more accurately than a DIYer.

The Trimble, TN homeowners’ guide to kitchen and bathroom remodels

From average costs to expert advice, get all the answers you need to get your job done.