Top-rated rototilling pros.

Get matched with top rototilling pros in Bluff City, TN

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Bluff City, TN?

Select your specific project to find the pro for you.

Find Rototilling pros in Bluff City

Avatar for Complete Creations

Complete Creations

No reviews yet

Complete Creations

No reviews yet
11 years of experience

Complete Creations has a team of four members with 15 years of experience in landscaping all over the Tri Cities area. We use our expertise in colorscaping, planting design, installments, and hardscaping to create a landscape that is perfect for you!

Complete Creations has a team of four members with 15 years of experience in landscaping all over the Tri Cities area. We use our expertise in colorscaping, planting design, installments, and hardscaping to create a landscape that is perfect for you!


Avatar for Kick'n Grass DBA: Hertz TerraChem

Kick'n Grass DBA: Hertz TerraChem

No reviews yet

Kick'n Grass DBA: Hertz TerraChem

No reviews yet
13 years of experience

Our business operates out of the Jonesborough area. We are one of the few landscaping services chartered and licensed to offer herbicide application along with full lawn and landscape maintenance.

Our business operates out of the Jonesborough area. We are one of the few landscaping services chartered and licensed to offer herbicide application along with full lawn and landscape maintenance.



Rototilling questions, answered by experts

Typically 1-3 days, depending on property size and terrain condition.

If you notice small bumps on your lawn, you can flatten them by gently treading them down when the ground is wet. A lawn with larger lumps may need to be regraded by a professional to flatten it out and improve the overall drainage of the yard to prevent future lumps from forming.

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

Grading refers to the sloping of your yard away from your house’s foundation. It’s a landscaping term you probably know well if you’ve ever had to push your lawn mower up a steep slope.

Leveling is the solution to grading issues since it involves making your yard flat and smooth (and easy to push a lawn mower through).

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.