Top-rated asphalt driveway pros.

Best asphalt driveway pros near Milbank, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Milbank, SD?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Milbank - Updated Nov 2026

Avatar for No Bull Concrete
No Bull Concrete
3.4(
5
)
Concrete Driveways - Install

Serving Milbank, SD and surrounding areas

In business since 2014

Free estimates

"I am very satisfied with the work. They were very accommodating with some changes and given the opportunity to re-negotiate the quote they stayed with the original. There were no surprise charges at the end of the job. The job required digging for the foundation wall and they replaced/removed the dirt and left the yard ready for seeding as indicated in the quote. I would hire them again."
Basketball Court
Garage Curb and Driveway
38x40 Addition
Getting ready for a pore at 6 a.m.
Curb at IHS in Sisseton

+19

Response time2 days
Recommended by60%of homeowners
WW Concrete
New to Angi
Concrete Driveways & Floors - Install- For Business

Serving Milbank, SD and surrounding areas

In business since 1998

Free estimates

We're family ran local company dedicated to providing our clients with the very best in concrete installation and repair for driveways, sidewalks, patios, steps, and a variety of other projects. With over 17 years of industry experience, we take and enormous amount of pride in the attention to detail put into each of the projects we're involved with. We're known for our quality work and the integrity of our business. We look forward to building long-term relationships with our clients, and guarantee your satisfaction.

Avatar for Enhanced Basements Foundation Repair LLC
Enhanced Basements Foundation Repair LLC
New to Angi
Concrete Driveways - Install

Serving Milbank, SD and surrounding areas

In business since 2024

Free estimates

Emergency services offered

Enhanced Basements foundation repair offers reliable and affordable foundation repair solutions. Our dedicated team is committed to providing high-quality services to address various foundation issues. We take pride in our work and strive to ensure the safety and stability of your property.

Showing 1-10 of 20
Asphalt Driveways FAQs, answered by experts

If you notice minor cosmetic problems with your driveway, you should seal it. Look out for cracks and holes on the surface, faded asphalt or concrete, and stains from oil and other chemicals. Replacing your driveway may be necessary if you’re dealing with significant problems—¼-inch cracks, large potholes, and puddles from drainage issues. The cost to install an asphalt driveway typically ranges between $4,200 and $9,000, significantly more than resealing. Consider talking to a professional to discuss whether resurfacing your driveway—a midway project between resealing and replacing—is a better option for you.

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

With proper maintenance, asphalt milling driveways can last 30 years or more. Over time, you’ll need to regularly sealcoat your driveway. You should also have your driveway inspected every few years and make any repairs as soon as they are necessary; this will prolong the lifespan of your driveway.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Milbank, SD homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.