Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Alexandria, SD

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Alexandria, SD?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Alexandria

Avatar for Advanced Concrete Construction, LLC
Advanced Concrete Construction, LLC
4.6(
32
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Alexandria, SD and surrounding areas

Approved

In business since 2006

Free estimates

Credit card accepted

"Pedro and his crew did an excellent job with our patio! They were very timely, professional, friendly, and of course skilled! Our front patio has been an eye sore for quite awhile, so the newly poured concrete patio is a nice upgrade. The crew got it done in 2 days! We will be using them again for other projects and cannot recommend them enough for anyone else looking for some concrete upgrades. Thanks, Pedro!"
Patio
Patio
Concrete work
Footing ad walls
Houling

+41

7 neighbors recently requested a quote
Recommended by75%of homeowners
Avatar for Scholten Construction, LLC
Scholten Construction, LLC
4.1(
43
)
Concrete Driveways - Install

Serving Alexandria, SD and surrounding areas

Approved

In business since 2014

Free estimates

Credit card accepted

"From start to finish I was very happy with Scholten construction. I got my estimate before Drew left my driveway his crew does a professional job and excellent quality work. I will always refer Scholten to friends or family and I will definitely call them back for another project."
Response time11 hrs
31 neighbors recently requested a quote
Recommended by72%of homeowners
Construction Pros, LLC
New to Angi
Concrete Driveways - Install

Serving Alexandria, SD and surrounding areas

Approved

In business since 2025

Credit card accepted

Offers commercial services

Construction Pros, LLC is dedicated to providing our customers with the best quality and craftsmanship. We are here to build relationships with our customers and communities and to provide our employees with a great place to work. We look forward to working with you! \n

8 neighbors recently requested a quote
Q&E Concrete LLC
5.0(
2
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Alexandria, SD and surrounding areas

In business since 2021

Free estimates

Credit card accepted

"We only had a small amount of sidewalk work, but they did an excellent job of fitting old natural stone into the original pattern. We had a great deal of other work done, and they were very efficient, very cheerful, and very reliable. I highly recommend Q & E Construction."
Response time3 days
Showing 1-10 of 32
Asphalt Driveways questions, answered by experts

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Asphalt and tarmac are not the same thing. Traditional tarmac, short for tarmacadam, uses tar as a binder to hold crushed stone together. Asphalt uses bitumen—a byproduct of crude oil—to bind aggregate. Though tarmac was once a go-to for roads, asphalt has become the modern standard. And these days, most surfaces referred to as “tarmac” are actually asphalt. So, while the names may overlap, the key distinction lies in the binder—tar for tarmac and bitumen for asphalt.

Asphalt is made of aggregate materials (sand, rocks, and gravel) and bitumen, a viscous, petroleum-based, waterproof substance. These materials are mixed together at extremely high temperatures to form asphalt.

Asphalt, which is stone mixed with tar, is the most common material for outdoor basketball courts because it’s so sturdy and versatile. However, you don't have to use it: another option is polymeric rubber, which has shock pads that can prevent injury. This option is a little more expensive, ranging between $16 and $25 per square foot.

Materials used for indoor basketball courts, such as hardwoods, aren’t really an option outdoors.

The Alexandria, SD homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.