Top-rated basement remodelers.

Get matched with top basement remodelers in Trio, SC

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Trio, SC?

Select your specific project to find the pro for you.

Find Basement remodelers in Trio

Avatar for A Plus Handyman Service
A Plus Handyman Service
4.4(
7
)

Serving Trio, SC and surrounding areas

Free estimates

Credit card accepted

"It was great 10 star service. The guys were very polite and gave me a lot of different options to choose from and did a fantastic job. I would definitely hire them again with any project that I may have in the future. Also saved me money in the end which was very helpful and convenient. They also wore masks ? to stay COVID-19 free and wore booties so they didn’t track in any dirt and cleaned up like they weren’t even there. Great company."
Working on the deck
Eight doors
Painting - Interior Project
Before pictures
Deck repair and painting

+60

Recommended by85%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Trio, SC and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for ND CONSTRUCTION LLC
ND CONSTRUCTION LLC
New to Angi

Serving Trio, SC and surrounding areas

We have the experience and dedication to get the job done right! Specializing in remodeling services; We guarantee your satisfaction, and we won't leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Call or click for your FREE estimate today!

Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project

+25

Graham Construction
New to Angi

Serving Trio, SC and surrounding areas

In business since 1999

Graham Construction works as a full-service, owner-operated licensed general contractor remodeling company specializing in residential interiors and exteriors. With our experience, you can be sure that we'll get the job done right the first time. That's why more than half of our business is from customer referrals. Our reputation is held highly and we take that very seriously. When we do a project, we are professional in all aspects of the situation. Our pricing is competitive and our workmanship is of the highest quality. We thank you for choosing us for your project.

Basement Remodel questions, answered by experts

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Installing a bathroom in a basement isn’t a project for most homeowners. Many parts—plumbing, electricity, and carpentry—go into this project, each requiring expert-level knowledge and tools. One miscalculation can lead to very expensive repairs. Plus, some homeowner’s insurance might not pay for damages caused by a homeowner DIYing this project. You can protect yourself by allowing the pros to complete this job for you. 

Costs are guided by renovation scope, materials chosen, project duration, structural needs, and labor. Prioritizing tasks prevents unforeseen expenses.

While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.

The Trio, SC homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.