Top-rated pool table assembly pros.

Get matched with top pool table assembly pros in Timmonsville, SC

Enter your zip and get matched with up to 5 pros

Need a pro for your pool table assembly project in Timmonsville, SC?

Select your specific project to find the pro for you.

TRUSTED BY TIMMONSVILLE, SC HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon70
    Verified pool table assembly services reviews

Find Pool table assembly pros in Timmonsville

Avatar for JDK Handyman
JDK Handyman
3.9(
4
)
Handyman for Multiple Small Projects

Serving Timmonsville, SC and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

"The work is absolutely amazing! Even some neighbors riding by stopped and asked them to come quote their yard! Thomas and Jessica worked together as a team to clear out old pinestraw to replace with new mulch in front and both sides of the house. They also trimmed hedges and pruned three trees. Before leaving they hauled off everything. They are down to earth and get the job done with fair pricing. I’m happy with the final outcome. My husband was so impressed that he hired them for another job!"
2 neighbors recently requested a quote
Baxter Construction & Renovation, LLC
5.0(
2
)
Handyman for Multiple Small Projects

Serving Timmonsville, SC and surrounding areas

Approved

In business since 2020

Free estimates

Offers commercial services

"I have rental properties and real estate homes, I cant get enough contractors to get out there to do the work so I have had him come and do work for me on these. He has done electrical, plumbing, and built in shelves, especially at the mobile park. It is hard to find contractors to do the work, but he is available, affordable, and worth the money. He put in more time to get the job done, he was timely and made sure the project got done."
Response time8 hrs
Recommended by100%of homeowners
Avatar for ShawleyWorks
ShawleyWorks
New to Angi
Handyman for Multiple Small Projects

Serving Timmonsville, SC and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

ShawleyWorks delivers dependable multi-trade services backed by real experience, professional equipment, and a strong work ethic. From facility maintenance and repairs to grading, land clearing, stormwater solutions, heavy equipment operation, and playground inspection, repairs and installation, we handle projects that require skill, versatility, and reliability. No shortcuts. No excuses. Just quality work done right.\n\n“Built on skill” “Driven on reliability”\n\n

Accent Wall
Ccs handyman
New to Angi
Handyman for Multiple Small Projects

Serving Timmonsville, SC and surrounding areas

Approved

Free estimates

My names Cayden Shadoan, I’m 23 years old. I have a beautiful wife and daughter. I have a full time job as a pipe welder in Sumter South Carolina. I’m on here just looking to pick up a couple extra jobs here and there in hopes of starting my own business one day to be able to stay home with my family more. I can do pretty much anything that needs done in or around your house. Specializing in building fences or repairing fences, any kind of piping jobs, or any welding. Thank you for considering me to help you get what you need done. Hope to see you soon.

...
Showing 1-10 of 77
Pool Table Assembly questions, answered by experts

Pool concrete or gunite can take several weeks to cure, or an average of 30 days, before workers can resume construction. Additional work and finishes push the time to build a pool out of concrete to between three and six months. There are many types of pools that take far less time, so keep these in mind if you're on a short timeline.

The best way to kill off an algae bloom in an aboveground pool is to shock it with a large dose of chlorine. Shock typically kills off algae in about one to three days, although it can take longer if the pool water is in poor condition. After the shock treatment, add algaecide to prevent algae from growing back, and test the water every few days with test strips to ensure the pool’s pH doesn’t get out of whack.

Once you use a pH decreaser, you can expect the pH to adjust in two to four hours. If you use a strong chemical like muriatic acid, it could take as little as an hour. Either way, it’s best to wait for a full turnover cycle before retesting. You want to make sure the chemical is completely dissolved and evenly distributed or you won’t have a stable pH level.

A pool heater is worth the expense, given that it can extend your swimming season by several months, depending on where you live. For many, adding a pool heater allows the pool to remain in service from May through mid-October. Even temperatures in the 40s and 50s are tolerable when the water in the pool is heated.

Above ground pools are not buried in the ground. Typically, above ground pools are semi-permanent. One reason they’re more affordable is that you don’t have to dig for an inground pool and pour concrete or another material. However, you can choose to install a semi inground pool, which is a hybrid between the two.

The Timmonsville, SC homeowners’ guide to pool table assembly services

From average costs to expert advice, get all the answers you need to get your job done.