Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Williamstown, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Williamstown, PA?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Williamstown

Avatar for Groundworks
Groundworks
3.8(
359
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Williamstown, PA and surrounding areas

Approved (Corporate)

In business since 1975

Free estimates

Warranties offered

"Cliff Wertz and George Wertz of Baker's Waterproofing were fantastic. Very polite and respectful of my daughter and me and of the property. They were very clean and worked extremely hard and were extra taxed by the heat, working in 90⁰+ degrees for two days doing very hard labor and precision work with the jacks. I would definitely have them back if I'd ever need anything else they provide."
Basement
Basement
Basement
Basement
Foundation

+16

Response time11 hrs
547 neighbors recently requested a quote
Recommended by86%of homeowners
Avatar for Lift It Pro
Lift It Pro
5.0(
8
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Williamstown, PA and surrounding areas

In business since 2024

Free estimates

Warranties offered

"We had a concrete walkway and patio that was in need of repair. Several cracks and not level. We had several estimates to replace,which was very expensive. We had Lift It Pro give us an estimate on leveling the concrete. The owner was professional, answered all our questions. His price was WAY LOWER than replacing. We were given references to call. He completed the job in the time frame promised. Only one day to raise the concrete, and can use the patio immediately. If considering concrete replacement or repair, do not hesitate to call Lift It Pro"
Back Patio
Back Patio
Pool Deck
Pool Deck
Pool Deckv

+4

Response time5 hrs
Response rate87%
Recommended by25%of homeowners
Avatar for Central Lending Svc Inc dba Credit Central
Central Lending Svc Inc dba Credit Central
4.8(
72
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Williamstown, PA and surrounding areas

In business since 2003

Emergency services offered

"I called because I was looking to refinance my mortgage. Simply,
instead of trying to sell me something I didn't need, Mark (the gentleman I
spoke with) told me this was not the right time for me to refinance. What he
told me made sense for my situation, and I appreciated the honest advice. I
will definitely look this company up again when it is time for me to refinance.
"
Additional Photos
Recommended by100%of homeowners
Avatar for Barrier Spray Foam, LLC
Barrier Spray Foam, LLC
3.5(
32
)
Concrete - Injection Leveling - Mudjacking - For BusinessConcrete - Injection Leveling - Mudjacking

Serving Williamstown, PA and surrounding areas

In business since 2009

Free estimates

Small jobs welcome

"Had concrete sidewalk slabs leveled, was out of level about 3" to each other and twisted one sided, fantastic job was done, results better then expected. I would highly recommend this company for leveling jobs. I rated customer service lower because pre hire communication was lacking at times"
Knee Wall
Partial Roof Deck
Knee Wall
Roof Deck
Response rate92%
13 neighbors recently requested a quote
Recommended by100%of homeowners
Showing 1-10 of 17
Concrete Mudjacking questions, answered by experts

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

Address drainage issues, avoid heavy loads, and seal cracks to prevent future settling.

Most projects take 1-3 hours, with immediate usability after completion.

It restores concrete, prevents replacement cost disruptions, reduces trip hazards, and provides stability at a lower cost.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

The Williamstown, PA homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.