Top-rated basement remodelers.

Get matched with top basement remodelers in Millheim, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Millheim, PA?

Select your specific project to find the pro for you.

Find Basement remodelers in Millheim

Avatar for WHL CONSTRUCTION
WHL CONSTRUCTION
4.3(
16
)
Basement - Remodel

Serving Millheim, PA and surrounding areas

Approved

In business since 2000

Free estimates

Warranties offered

"They were absolutely amazing to work with. Our house is 118 years old and they hadn't been updated since the 70s. They treated my home like their own. I am beyond happy with the end result"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+24

Response time7 hrs
2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Rovenolt Contracting
Rovenolt Contracting
New to Angi
Basement - Remodel

Serving Millheim, PA and surrounding areas

Approved

In business since 2021

Free estimates

Credit card accepted

Rovenolt Contracting is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.\n\n+8 Years of Experience\n

Response time2 days
Response rate95%
Avatar for WHL Construction  Facebook
WHL Construction Facebook
4.2(
45
)
Basement - Remodel

Serving Millheim, PA and surrounding areas

In business since 1998

Free estimates

Emergency services offered

"Bill and his crew are top-notch professionals. We had them install vinyl siding and replace a few doors. Everything was done perfectly. The crew did a great job making sure everything was cleaned up on a daily basis and at the end of the job. That was very important to us having two children that run around outside. I would highly recommend them to anyone."
Siding
Siding
Siding
Siding
Remodel

+27

Response time9 hrs
Response rate86%
Recommended by91%of homeowners
Avatar for Whippoorwill Woodworx
Whippoorwill Woodworx
5.0(
5
)
Basement - Remodel

Serving Millheim, PA and surrounding areas

In business since 2023

Free estimates

"“Great work & very trustworthy. Worked with Sam Weber on a quick job on our kids’ rooms. He was very knowledgeable about potential issues before getting into it & was able to get it finished very quickly. I would trust him with any future builds or remodels."
Indoor Wall Painting
Single door installation
Double door installation
Interior Hanging - Deer Mount
Bathtub Caulking

+28

Recommended by100%of homeowners
Avatar for Brand New Basement
Brand New Basement
5.0(
2
)
Basement - Remodel

Serving Millheim, PA and surrounding areas

In business since 2020

Free estimates

Credit card accepted

We have 15+ years of experience. A wet basement is terrible for your health and the health of your home. Today’s technology makes it easier than ever to turn a problem area into a prosperous area. It doesn’t have to cost an arm and a leg. I’m a contractor who will do the same job for a lot less than the other guys. Save a ton of money on your Brand New Basement.

Additional Photos
Recommended by100%of homeowners
Avatar for P&A Services
P&A Services
5.0(
3
)
Basement - Remodel

Serving Millheim, PA and surrounding areas

In business since 2012

Free estimates

Credit card accepted

"I hired PA services for a bathroom remodel. They have done an absolute wonderful job. They done so good that I hired PA services for kitchen remodel now they are nice. Takes the time to really explain everything to me does great work. I appreciate him and his company. If you’re looking for a remodel higher Pa services very professional"
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Additional Photos

+6

Recommended by100%of homeowners
Showing 1-10 of 45
Basement Remodel questions, answered by experts

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Kitchens and bathrooms are typically the most expensive rooms to renovate. The high cost is due to several factors, including expensive appliances like ranges, hoods, and refrigerators, as well as costly fixtures. The 'bones' of the room, such as electrical and plumbing, are also expensive to move or replace. Because of the vast amount of prep work, finishing, and specialized labor involved in a relatively small footprint, these projects can cost double or more than a living space remodel. Even when trying to renovate on a budget, kitchens and bathrooms will likely carry a hefty price tag.

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

Whether it’s more affordable to gut a house than build a new one depends on the markets where you'd be buying and selling. However, it’s usually less expensive to renovate a home than to build new construction. 

Most homeowners pay between $100,000 and $200,000 for demolition and remodeling costs, whereas the average cost to build a new home is between $139,000 and $531,300.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Millheim, PA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.