Top-rated basement remodelers.

Best basement remodelers near Flemington, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Flemington, PA?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Flemington - Updated Nov 2026

Avatar for Whippoorwill Woodworx
Whippoorwill Woodworx
5.0(
5
)
Basement - Remodel

Serving Flemington, PA and surrounding areas

In business since 2023

Free estimates

"Great listener. Phenomenal work ethic. Worked consistently until the job was done, which, unfortunately, was a short timeline. All qualities that are very hard to find nowadays."
Indoor Wall Painting
Single door installation
Double door installation
Interior Hanging - Deer Mount
Bathtub Caulking

+28

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Flemington, PA and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Kish Construction LLC
Kish Construction LLC
4.2(
5
)
Basement - Remodel

Serving Flemington, PA and surrounding areas

In business since 2013

Credit card accepted

"Having bad experiences working with other contractors in the past, I was nervous to hire someone else to perform a much needed remodel to my 15 year old bathroom. Thankfully, I’ve come across Kish and she was able to exceed my expectations. She was very thorough throughout the entire process from start to finish and was extremely on point focusing on the details of the finishings I wanted. I received so many compliments from friends and family! I’m looking forward to hiring her to perform my kitchen remodeling next!"
Remodeling - General Project
Remodeling - General Project
Attic Remodel
Basement
Marble floors

+54

Recommended by80%of homeowners
Avatar for LSM Solutions
LSM Solutions
3.7(
6
)
Basement - Remodel

Serving Flemington, PA and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"I contacted LSM Solutions for a quote and some advice on a small remodeling project my wife and I were thinking of doing in our home. They responded very quickly and agreed to give us several different options and cost estimates at no cost or obligation to us. They were very courteous and professional and patiently answered all of our questions. They were knowledgeable in all of the areas we were interested in remodeling. While we haven't made a decision on when to start our project, we were very pleased with their service and would be very comfortable hiring them when we make a decision to move ahead with our project."
Response time2 days
Recommended by100%of homeowners
Showing 1-10 of 30
Basement Remodel FAQs, answered by experts

Any bowing in a basement wall indicates a problem that needs to be addressed by a professional. If your basement wall bows more than 1 inch, it's time for an inspection. Generally, a wall can bow up to 30% of its thickness (around 2.5 inches for an 8-inch-thick wall) before it becomes an urgent situation. Bowing of 2 to 4 inches is more straightforward to fix than bowing of more than 4 inches, which will require significant repairs. If the bowing is more than 6 inches, the wall will likely need to be replaced. The sooner you address the problem, the easier and less expensive the repair will be.

Yes, you can add a bathroom to an unfinished basement, but you’ll want to take proper precautions if doing so. As with any bathroom addition, you’ll need to make sure that it’s approved by local building authorities first. With unfinished basements, you especially need to keep an eye on proper ventilation practices.

Envision the type of bar experience you'd like to create for your guests. For example:

  • Does your basement have enough finished space for bar stools or seating?

  • What type of additional lighting would set the tone for the room?

  • Are there basement windows or an HVAC system?

  • Do you need new plumbing in your basement for a proper wet bar?

  • Could you be happy with a built-in wall cabinet bar rather than a full-scale wet bar?

Yes, in most cases, finishing a basement is worth the cost. The project adds valuable, usable square footage to your home and typically provides a return on investment (ROI) of 70% to 75%. For example, an average basement refinishing project costing $32,000 could add between $22,400 and $24,000 to your property's value. The final value added depends on factors like your location, the quality of materials and workmanship, and the features you include, such as a living space, bedroom, or bathroom. To be officially counted in your home's total square footage, the finished space must comply with all local building codes, including requirements for points of egress. However, in areas prone to flooding, a finished basement might be seen as a liability by potential buyers and could potentially decrease your home's value.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Flemington, PA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.