Top-rated rototilling pros.

Get matched with top rototilling pros in Loganton, PA

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Loganton, PA?

Select your specific project to find the pro for you.

Find Rototilling pros in Loganton

Murphys Lawncare and maintenance

117 Chrysler Street
No reviews yet

Murphys Lawncare and maintenance

117 Chrysler Street
No reviews yet
12 years of experience

We are a family owned and operated business and we enjoy what we do and it shows in our work we offer the best prices around on all our services and always have great specials

We are a family owned and operated business and we enjoy what we do and it shows in our work we offer the best prices around on all our services and always have great specials




Rototilling questions, answered by experts

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

Yes, you can rent a rototiller for around $60 per day and do the work yourself, but it’s not recommended. Tilling is more of an art than a science, as tilling too deep can be detrimental to your soil structure and the organic matter that is beneficial to plants and shrubs, and tilling too shallow won’t properly introduce fertilizer or break up the soil for rooting plants. Additionally, tillers are powerful machines with sharp blades to cut through small roots and soil, so they are inherently dangerous to use. It’s usually worth it to hire a professional rototiller.

Professional equipment adapts to different terrains, ensuring thorough aeration across all lawn areas.

Typically 1-3 days, depending on property size and terrain condition.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"