Top-rated basement remodelers.

Get matched with top basement remodelers in Jermyn, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Jermyn, PA?

Select your specific project to find the pro for you.

Find Basement remodelers in Jermyn

Avatar for CBD Contracting
CBD Contracting
5.0(
23
)
Basement - Remodel

Serving Jermyn, PA and surrounding areas

Emergency services offered

Credit card accepted

"Jouseff did a wonderful job He is very efficient, explains everything to be done clearly. I m very pleased with him, and would definitely hire him again, and will recommend him to my friends."
Plumbing Project
Plumbing Project
Plumbing Project
Plumbing Project
Plumbing Project

+7

Recommended by100%of homeowners
Avatar for Kingston Flooring
Kingston Flooring
4.7(
22
)
Basement - Remodel

Serving Jermyn, PA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"I called for a quote on Saturday, and the work was done on Wednesday! The owner came and did it himself and did an amazing job at half the price of other local contractors! My floor has never looked better. I would recommend this company to anyone looking for fast service and perfect quality work. 10 out of 10 stars!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+21

1 neighbors recently requested a quote
Recommended by90%of homeowners
PPHI
4.7(
117
)
Basement - Remodel

Serving Jermyn, PA and surrounding areas

In business since 1999

Free estimates

Emergency services offered

"Excellent job, very professional, courteous, and timely. Rob handled everything on my project, the job site was always very clean and tidy throughout. He was punctualand reliable. Most important, he's an extremely nice guy. He's one of those type of people that you feel like you have known forever after having just met him. He is now my go to guy!"
Recommended by96%of homeowners
Avatar for Gennaro`s Property Management LLC
Gennaro`s Property Management LLC
4.1(
18
)
Basement - Remodel

Serving Jermyn, PA and surrounding areas

In business since 2010

Emergency services offered

Credit card accepted

"Gennaro is a very nice person. I had to do a home remodel from top to bottom. He and his team are very good. I really had a tight budget where it was not possible for me spend any more other than what we decided. But Gennaro really worked very hard for me 
to achieve what i needed. It took more time than decided but he and his team really turned my home into a miracle.
God bless him and his team members.
Thank you so very much.
"
under ground 1
Additional Photos
custom kitchen
Additional Photos
Additional Photos

+17

Recommended by80%of homeowners
Avatar for LJC Painting & Construction
LJC Painting & Construction
4.3(
32
)
Basement - Remodel

Serving Jermyn, PA and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"I recently had LJC Painting and Construction handle a bathroom remodel for me, and I couldn’t be happier with how everything turned out. Mike did an great job — the space looks completely transformed. The tile work, painting, and finishing touches were all super clean and professional. Mike is reliable, easy to communicate with, and clearly takes pride in his work. He explained everything as he went and made the whole process stress-free. The quality of the remodel honestly exceeded my expectations. If you’re looking for someone who does top-tier work and truly cares about the final result, Mike and LJC Painting and Construction are the ones to call. Highly recommend and will definitely use them again!"
Painting - Interior Project
Remodeling - General Project
Interior Painting Project
Remodeling - General Project
Interior Painting Project

+157

Response time3 days
Recommended by75%of homeowners
...
Showing 1-10 of 84
Basement Remodel questions, answered by experts

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

The Jermyn, PA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.