Top-rated asphalt driveway pros.

Best asphalt driveway pros near Jamestown, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Jamestown, PA?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Jamestown - Updated Nov 2026

Blackburn Companies LLC
5.0(
6
)
Brick and Stone Driveways & Floors - InstallConcrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install+1 more

Serving Jamestown, PA and surrounding areas

Approved

In business since 2020

Free estimates

Credit card accepted

Blackburn Companies, LLC is a General Site Contractor for both commercial and residential projects. We specialize in New Construction, Renovation, Remodeling, Excavating and Land Clearing.

6 neighbors recently requested a quote
Recommended by66%of homeowners
Avatar for C&H Excavation Services, LLC
C&H Excavation Services, LLC
5.0(
2
)
Concrete Driveways & Floors - Install- For Business

Serving Jamestown, PA and surrounding areas

Approved

In business since 2003

Free estimates

Credit card accepted

"I've known Ed for years and he's always been a professional and upstanding guy. When getting a quote I just met his business partner Chevy, he knows his stuff about concrete with over a decade in the industry. Together they make a great team. We have done remodeling and construction for years and we knew exactly what we wanted and told them our plans and showed them the layouts. With a few suggestions and tweaks on their end, it was a fast easy project when we all worked together. Upstanding guys and a great price. We have them on board for our concrete contractors when we need them for renos."
Response time4 hrs
7 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 52
Asphalt Driveways FAQs, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Asphalt is not a type of concrete. While both are a common type of pavement, asphalt is composed of aggregates (like sand and gravel) and bitumen; concrete is a mixture of cement, aggregates, and water. Here are some of the key differences between asphalt and concrete driveways.

Whether you should resurface or replace your asphalt driveway heavily depends on its condition. If the foundation is solid and the damage is minor, resurfacing is your best bet because it’s more affordable and faster than replacing the driveway. But if your driveway has foundational problems and/or severe damage, like large, deep cracks and potholes, then it makes more sense to replace it. 

Recycled asphalt is not better than gravel, but can be a good alternative. It is inexpensive, but not as low-cost as gravel, and doesn’t tend to last as long. Recycled asphalt isn’t as dusty as gravel and is more environmentally friendly. The black look can be something that homeowners prefer. No matter what, ensure you choose an experienced recycled asphalt contractor. 

Depending on project size, typically 1 to 3 days, including preparation and installation.

The Jamestown, PA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.