Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Felton, PA

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Felton, PA?

Select your specific project to find the pro for you.

TRUSTED BY FELTON, PA HOMEOWNERS

  • Average homeowner rating star icon4
    Average homeowner rating
  • Verified reviews icon103
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Felton

Avatar for Budget Paving Service
Budget Paving Service
5.0(
75
)
Asphalt Sealing

Serving Felton, PA and surrounding areas

Approved

Super Service Award Winner

In business since 2005

Free estimates

Emergency services offered

"I was very pleased with this company. They were kind enough to call and say they were running late. My driveway looks great and the employees who did it did a wonderful job. Their price was also reasonable. Would definitely hire them again when my driveway needs sealed."
Our work
Our work
Our work
Our work
Our work

+1

Response time6 hrs
Response rate95%
54 neighbors recently requested a quote
Avatar for TK Paving and Sealing LLC
TK Paving and Sealing LLC
4.9(
17
)
Asphalt Sealing

Serving Felton, PA and surrounding areas

Approved

In business since 1994

Free estimates

Emergency services offered

TK Paving And Sealing LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

32 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Road Paving Construction Inc
Road Paving Construction Inc
5.0(
6
)
Asphalt Paving - InstallAsphalt Paving - Install- For Business

Serving Felton, PA and surrounding areas

Approved

In business since 2014

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the \nconsumer’s needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start \nto completion of a project. In order to understand the needs and expectations of our customers, we take great care to \nwork and communicate with every customer in a professional manner. Our reputation is based on service, safety, and \nquality, regardless of how large or small the job.

4 neighbors recently requested a quote
...
Showing 1-10 of 178
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The material that’s best for your private road depends on your property, the climate in your area, and your personal preferences. Gravel is an affordable option, but some homeowners don’t like how it looks. It can be a pain to remove snow from, and it requires more ongoing maintenance than asphalt or concrete. However, while these other options require less maintenance and make snow removal a breeze, they’re more expensive and will need repairs from time to time. Ultimately, you’ll have to choose the road material that suits you and your property best.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Your city or county will have guidelines about the minimum and maximum width and length of private roads. The average private road is 12 feet wide, and length, of course, depends on your property. Requirements also depend on the amount of traffic and types of vehicles your road experiences. Check with local ordinances before planning a road on your property.

Several materials are suitable for steep driveways. Gravel and crushed stone are affordable options that provide good traction. Permeable pavers—such as plastic, rubber, or concrete—filled with gravel or crushed stones are also excellent, as they allow water to drain without causing erosion and perform well in ice and snow. Another option is resin, which can be coated with an anti-slip finish and helps prevent puddles. For added stability, you can install a retaining wall to prevent pavers and gravel from shifting over time.

The Felton, PA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.