Top-rated basement remodelers.

Best basement remodelers near Hines, OR

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Hines, OR?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Hines - Updated Nov 2026

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Hines, OR and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for RSU Construction LLC
RSU Construction LLC
3.0(
106
)
Basement - Remodel

Serving Hines, OR and surrounding areas

In business since 2002

Free estimates

Emergency services offered

"We weren't that happy with the results. It was a few years ago, and the surface is still pretty much intact. He had to use a primer and deck paint, rather than stain, and the primer showed through in several places as bright white marks against the dark brown stain. He left the extra paint so we could refinish where we wanted. We don't want or expect any follow up at this time. I understand that the deck needed a lot more work than the worker expected. So, my experience may not be a fair representation of this particular contractor.
"
Additional Photos
Recommended by53%of homeowners
Avatar for JBC Group Solutions Inc
JBC Group Solutions Inc
4.0(
4
)
Basement - Remodel

Serving Hines, OR and surrounding areas

In business since 2007

Emergency services offered

"I have been using them for 3 years for multiple projects and would not go to somebody else. They also built a cabin in the woods. It was built 10 miles from the road so it was like carrying all the stuff up the path. They also did the garage and remodeling of the house, mostly kitchen and a little bit of plumbing work in the bathroom. I am still using them and I would be using them for the next thing that will be coming up too."
Custom Staircases
Custom Exterior Restoration
Custom Bathrooms
Recommended by75%of homeowners
Ironside construction and remodel
New to Angi
Basement - Remodel

Serving Hines, OR and surrounding areas

In business since 2007

Free estimates

Ironside Construction is a local family-owned construction company. Every job we take on starts with a commitment not only to the project, but to our customers and community. We’re proud to run a business built on quality work and personal relationships with our clients.Residential construction and remodel. We have a diverse background in flooring, framing, roofing and all aspects of the remodel process!

Basement Remodel FAQs, answered by experts

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Although homeowners often use the terms basement remodeling and basement finishing interchangeably, they are quite different terms. 

Finishing a basement is the process of taking a basement space that is not habitable and adding elements to make it usable. This includes adding plumbing, flooring, and insulation.

Remodeling a basement means taking an already existing finished basement and changing it, often by adding or removing walls, adding plumbing, or changing the existing flooring.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

A finished basement does not always count as square footage, as this varies by state regulations. In areas that allow below-grade spaces to be included in a home's official square footage, the basement must typically meet certain conditions. These conditions often include having a functional egress and being a livable space with flooring, finished walls, and temperature control. To be certain, contact your local assessor to confirm your area's specific policies regarding basement square footage.

Yes, most general contractors require an initial down payment, typically between 10% and 25% of the total project cost. This upfront payment helps cover the costs of materials, permits, and subcontractors. The remaining project costs are usually billed after specific project milestones are reached or on set completion dates, as outlined in your contract. Be wary of contractors who require a significant deposit of 50% or more upfront, as this could be a red flag for a scam.

The Hines, OR homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.