Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Stigler, OK

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Stigler, OK?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Stigler

Promax Concrete
5.0(
2
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Stigler, OK and surrounding areas

Free estimates

Credit card accepted

"I'm one of the first people to review this business! Naturally, because of that, I was somewhat skeptical about if I should hire Joey and his crew. I'm really glad that I did. Joey did great work to hand mix and pour a small concrete pad for a greenhouse in my backyard. He was easy to work with, reasonably priced, prompt, and cleaned up when he was finished. He helped me make some decisions for the placement, and even gave me some advice about how we could cut the cost down on the project. He even threw in a little extra repair to a brick I had that was falling out of a retaining wall close to the site where he was working on my main project. Give these guys a chance, and they'll do great work for you!"
Concrete Patio
Recommended by100%of homeowners
Rustic Roots Concrete & Construction
New to Angi
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Stigler, OK and surrounding areas

In business since 2024

Free estimates

We offer a variety of concrete services. We guarantee your satisfaction, and we won’t leave until the job is done right. We pride ourselves on the quality of work we provide, while delivering great customer service! Check out all the services we offer below and call -or- click to schedule an estimate today! \n

Concrete Mudjacking questions, answered by experts

Costs range from $500 to $1,500, depending on the size and condition of the area.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

The average cost for mudjacking is around $1,200, though prices can range from $300 to $3,400. On a per-square-foot basis, you can expect to pay between $3 and $8, with an average of about $5 per square foot. The final cost depends on several factors, including the square footage of the concrete, the type of slab, its accessibility, whether it is load-bearing, and the type of material used to lift it. Generally, lifting a driveway, small patio, or sidewalk is less expensive than lifting a slab foundation or garage floor.

Many contractors offer warranties for their work. Confirm terms before starting the project.

The timeframe is generally a few hours, allowing for immediate use post-hydration, ensuring minimal disruption to surrounding activities.

The Stigler, OK homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.