Top-rated pool builders and installers.

Get matched with top pool builders and installers in Peebles, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your pool construction and installation project in Peebles, OH?

Select your specific project to find the pro for you.

Find Pool builders and installers in Peebles

Avatar for The Deep End
The Deep End
5.0(
18
)
Replace Vinyl Liner for Swimming PoolSwimming Pool: Vinyl Lined - Build or Install

Serving Peebles, OH and surrounding areas

Approved

In business since 2015

Free estimates

Small jobs welcome

We manage the whole process, from the preliminary estimating to the final clean-up, with thorough attention to detail and open communication. I believe in working with people and keeping them informed every step of the way. Quality takes priority, either a job is done right or it’s not worth doing at all. After all, this is a tailor- made service for you. \n

New pool install
New pool install
New pool install
Pool remodel
Pool remodel

+9

Response time7 hrs
Response rate96%
19 neighbors recently requested a quote
Avatar for MOST VALUE POOLS LLC
MOST VALUE POOLS LLC
5.0(
5
)
Above Ground Swimming Pool or Accessories - Repair or ServiceSwimming Pool - Above Ground, Build or Install - Have MaterialsSwimming Pool - Opening & Closing Service

Serving Peebles, OH and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"The guys were absolutely amazing! Their customer service was outstanding, and the quality of their work was a 10/10. I would recommend them 1,000% to anyone looking for a pool installation. My pool is 30? x 54?, and thanks to them, my kids and I are finally able to enjoy the summer. We couldn?t be happier with the results. Thank you for a job well done!"
Photos
23 neighbors recently requested a quote
J and J Pool
2.0(
3
)
Replace Vinyl Liner for Swimming PoolSwimming Pool - Opening & Closing Service

Serving Peebles, OH and surrounding areas

In business since 2017

Free estimates

Credit card accepted

Our company is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customer's interests and make their concerns the basis of our business. Please give us a call today! \n

Response time4 days
Recommended by50%of homeowners
Avatar for A&E Pools and Construction
A&E Pools and Construction
New to Angi
Swimming Pool: Vinyl Lined - Build or Install

Serving Peebles, OH and surrounding areas

Free estimates

Emergency services offered

Warranties offered

We are A&E Pools and Construction, family owned business and fully insured. Our services include new pool builds of your choice between in ground or above ground. We also service, renovate, repair, and clean pools! You can call and ask how we can help anytime at;\n\n740-352-5588

Showing 1-10 of 19
Pool Construction and Installation questions, answered by experts

ALTA/ACSM surveys are the most comprehensive type of land survey and, as such, tend to be the most expensive. These surveys have standardized guidelines and reports and are used in many kinds of real estate transactions to ensure consistent and accurate information is available for properties.

The longest part of building a custom home is the design phase. It takes multiple professionals and a ton of work to bring your vision for your dream home to life while sticking to a homebuilding budget and also ensuring everything is built to code. Expect the design phase for a custom home build to take six months to a year.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

Construction typically takes 3-6 months, including site preparation and assembly.

If a buyer pays for a survey, the surveyor they hired will only provide results to them. It’s up to the buyer whether they share the survey results with the seller or not, even if they ultimately walk away from the deal. It’s considered good faith to share the results with the seller, though, especially if you back out of the deal, as the seller can then provide that survey to future interested parties.

The Peebles, OH homeowners’ guide to pool constructions and installations

From average costs to expert advice, get all the answers you need to get your job done.