Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in North Lima, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in North Lima, OH?

Select your specific project to find the pro for you.

TRUSTED BY NORTH LIMA, OH HOMEOWNERS

  • Average homeowner rating star icon3.9
    Average homeowner rating
  • Verified reviews icon18
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in North Lima

Avatar for HARD LUCK CONSTRUCTION, LLC
HARD LUCK CONSTRUCTION, LLC
5.0(
5
)

Serving North Lima, OH and surrounding areas

Approved

In business since 2020

Free estimates

Offers commercial services

At Hard Luck Construction, LLC, we take great pride in our experience, expertise, quality and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner.

Profile Picture
23 neighbors recently requested a quote
...
Showing 1-10 of 122
Asphalt Driveways questions, answered by experts

While paving a driveway is possible to do as a DIY project, we don’t recommend it. Hiring a driveway professional to pave it will ensure that your driveway looks neat and clean and lasts for years to come, and it will also prevent a weak driveway and, potentially, damage to your foundation. Paving a driveway requires heavy machinery, and while you can rent the equipment needed, operating it close to your garage slab or around your home’s foundation can crack it and lead to structural issues. 

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

Regular cleaning, sealing, and timely repair of cracks help maintain its condition.

You should contact your driveway installer before winterizing a newly installed driveway. Winterizing it before the asphalt or concrete has fully cured can damage the driveway. But in many cases, you don't need to winterize a newly installed driveway anyway since it's likely freshly sealed and won't have much damage yet. 

The North Lima, OH homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.