"Great so far Tristan was on time. I had water damage in my main bathroom he got the flooring, toilet, vanity in so we were able to use them. The shower is next. He is also doing dry wall and painting in the rest of my house. Did a great job in cleaning up."
"Dan and his team were very professional and knowledgeable about the work. The planning and estimation process was very transparent. No hidden costs or surprises. All work is done legally with a professional contractor for plumbing and electrical work. Different options and recommendations are shared through out the project work. Crew was very polite, respectable and professional. They made sure no unnecessary noise was created and kept the house & working area clean. They would clean up after the work. I will recommend Beautiful Basements for any remodeling work and especially for the basement remodeling."
"John and his crew did a great job remodeling our basement. They were very organized, professional and did quality work. The Project was finished ahead of schedule. I would not hesitate to recommend John Grabenstetter for your basement remodel."
"A big thanks to Pete, Chad and the rest of the crew for our bathroom remodel. It was a big project in a small space so working conditions were less than ideal. Every project comes with an unexpected curve ball or two, and these guys handled them very well. We talked through options and were able to agree on solutions quickly when things came up. At the end of the day, we are very happy with the work and customer service throughout the process and would definitely call them again if/when another project comes up. Thanks again!"
"I wish I could give more than 5 stars! The team transformed our basement into a beautiful, livable space. Their quality, communication, and attention to detail were outstanding. If you are considering a basement, kitchen, or bathroom remodel, just hire them. You will not be disappointed!"
"Looks great! Braden had custom cabinets made and stained to match our existing cabinets. The installation took only took one day. Braden was very easy to work with and would hire again."
"Unbelievable Job by Center Line! Complete kitchen remodel. Amazing attention to detail and complete professionals throughout the entire process. Would and will recommend to anyone looking for a remodel that wants a stress free process! Thanks guys!!"
"They removed paneling, put up drywall, new trim, opened up a closet, put on louvered doors, a regular door, and painted. My husband and I could not be happier. All the professionals were friendly and did an excellent job. We would rehire Freedom Contracting if we have any future job. Highly recommended!"
The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.
Yes, most general contractors require an initial down payment, typically between 10% and 25% of the total project cost. This upfront payment helps cover the costs of materials, permits, and subcontractors. The remaining project costs are usually billed after specific project milestones are reached or on set completion dates, as outlined in your contract. Be wary of contractors who require a significant deposit of 50% or more upfront, as this could be a red flag for a scam.
Making a window in a basement larger costs an average of $4,200. You’ll need to pay an average of $550 to have a structural engineer plan the project, $500 to $1,500 for the installation labor, and an average of $2,200 for the excavation and window well installation. The remainder will go toward pulling permits, installing trim, and repairing drywall on the interior.
The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.
There are several small, inexpensive upgrades you can make to upgrade your basement. Although you still need to adhere to building codes and obtain permits when necessary, you can complete small but mighty tasks like painting the masonry walls and installing entertainment devices to make the space more usable.
The Fairlawn, OH homeowners’ guide to basement remodels
From average costs to expert advice, get all the answers you need to get your job done.
If your basement ceiling is low, there are ways to raise it. Learn more about the cost to raise a basement ceiling to be able to enjoy your basement and create a more usable space in your home.